挖矿的英文
1. 求助采矿专业英文翻译!!!不要软件翻译完贴过来的!没分了!谢谢了!
译文如下:
Abstract: zhongping can turn the group in GaoZhuang ore mining ShiLongOu pingdingshan's territory, HanLiang central, about 56 kilometers away from downtown. Field exploration area of 9.6 square kilometers, the design of mine proction capacity 900,000 t/a. Simple structure, within the field geological recognize base-level cycle for oneself 16-17 coal, dip Angle is lesser, 0-10 °, coal seam gas 6.4 m, average thickness for 3.63 earned run average relative emission, absolute m3 / t 176 m3 / for emission, belong to low gas min mine, coal seam spontaneous period for 2 -- 3 months, the mine 300m3 / h normal section. Design USES vertical single level mountain exploration, mining coal preparation, the comprehensive mechanized of longwall mining process, to layering exploitation, all collapse method of mined-out area, the central falls method processing boundary type ventilation. All realize mechanization mine, the adoption of advanced technology and reference has realized high yield and high efficiency, realize the modernization of the experience of a mine mine mine a high yield and high efficiency to achieve good economic and social benefits.
Keywords: mining special preliminary design; Low gas mine; Vertical shaft; Single level mountain development; Mining type ready; Comprehensive mechanized mining longwall mining methods, toward; The layering exploitation; All the pieces fell method, the central boundary type.
希望有帮助到您,乜希望您可以采纳我的答案。
2. 求一款挖矿游戏,英文名,三年前玩过的
微小矿工,英文名字Micro Miners 我以前也老爱玩这个
3. 采矿业的英语翻译 采矿业用英语怎么说
采矿业
[工经][矿业] mining instry更多释义>>
[网络短语]
采矿业mining;Mining Instry;Mining and Quarrying
采矿业协会National Mining Association
采矿业发展mining instry development
4. 采矿专业英文翻译
The Ge Ting coal mine is that Zi Bo City Bureau of Mines develops the third pair of the northwest part modernizing a shaft , being located in Shandong Province Ji Ning City building in helping north mining area. The shaft year designs 600,000 tons of efficiency , design the length of service 51. The shaft may cut coal being 3 coal , 16 coal , 17 coal tier mainly , the host mines 3 coal seams. The village , highway pressure coal are grave and , 3 coal seam length of service shortens since shaft geology condition is complicated,be prolong the shaft length of service, decide to exploit 16 , 17 coal, coal matches spirit with 3. And design that condition considers the queen synthetically , put forward opens up a scheme by the geology general situation , well-field range , reserves and 16 , 17 coal seam geology to well-field originally , push and big alleys by the fact that the economy technology ascertains the tie making use of 130 orbits to go up the hill preparing adhesive tape going up the hill comparatively going up the hill exploiting, the mining area being in progress to 1160 mining area designs that. By the analysis to 1160 mining area geology condition, the for sure adopt long unitary make for wall coal mining law , single wing exploits, coal mining handicraft has adopt top grade Pucai , has adopt all caving law to manage a roof, driving face adopt a cannon dig. And carry out equipment choosing a type , arrange turn out system after ascertaining the mining area parameter, work out safe technology measure. Keywords: Well-field opens up , mining area , make for increase wall coal mining law , top grade Pucai
5. 求助采矿专业英文翻译!!!不要软件翻译完贴过来的!谢谢了!
In a large number of laboratory tests on the basis of the research on the success to the horizontal stratified into road type coarse aggregate pipe-conveying their high mining filling new technology, with "high density and high flow pattern, the proportion, low cost" characteristic, is set high concentrations of their filling and paste pumping filling advantage in a body, and cheap mining thick bone filling new technology. Experiment shows that e to the macrolevel aggregate, can greatly rece the cost of filling, can make the most use mine to rise.
6. 矿工英文
miner.mine是矿,miner直接的意思就是挖矿的人,中文就是矿工了
pitman也可以指矿工,还有锯木工助手,维修站修车工,乐师等意思
7. 采矿英语翻译
This design altogether nine chapters, respectively are the general remarks, the technical economy, the mining geology, mining, the mining slope ramp design, the mine ventilation design, the mining machinery, the assembly drawing transportation, safe specially. And mining, the mining machinery, the mining slope ramp project are the design main bodies, in mining used advanced low poor has damaged the non-lower column partition to come down the law, will have the huge economic efficiency, the special mining slope ramp project, mainly included the slope ramp position the determination, the slope ramp form choice, the slope ramp cross section specification, the slope ramp slope, slope ramp aspect and so on curve design, slope ramp construction contents. Some parts of designs contain the essential blueprint, the blueprint must defer to the concerned requirements plan.
8. 黄金矿工的英文是什么
gold miner
9. 有一种黄金挖矿游戏名字是英文版的
me at a distance; but that
until she heard fros
10. 采矿用英语怎么说
您好!
很高兴为你翻译、解释。您提出的采矿用英语怎么说?
只有专业说法:mining(汉字注音:埋岭)最准确。(汉语含义:n.采矿, 矿业)可做动名词。
英语的其他表达方式均不能准确地表达“采矿”的动名词。
例如:mine pron.我的;n.矿, 矿山, 矿井, 源泉, 宝库, 地雷, 水雷;vt.挖掘, 开采, 在...布雷, 破坏
vi.开矿, 埋设地雷等,只适合做“开矿”的动词
希望我的翻译、解释对你有帮助,祝你心想事成!