Rx470 and gtx1050ti mining
grinding
process and
bulging
properties and reasons, no matter what the reason, the feeding should be stopped first, and then the necessary treatment should be carried out according to different situations
for open circuit grinding, as long as the feeding water (back water) is properly increased after the ore feeding is stopped, the
ore material
is slowly discharged from the
grinding machine, and the swelling can be eliminated and returned to normal
for closed-circuit grinding, because feeding is composed of two parts, namely original feeding and
classifier
return sand, only the original feeding is stopped. Because the return sand is continuously fed into the grinder, it is still not concive to eliminating the bulging phenomenon. Therefore, the amount of return sand should be reced as soon as possible. The specific measures are as follows:
increase the water before closing (adding water to discharge ore of the grinder) to rece the water amount into the classifier tank, In order to improve the classification mass fraction, a large amount of ore material is discharged by overflow, so as to rece the amount of return sand. The increase of feed water can rece the mass fraction of ore in
mill, increase the fluidity and accelerate the discharge of materials. This method is summed up as a doggerel: "the front water is closed, the back water is added, and the concentration (graded concentration) is increased to rece the return sand". Sometimes, in order to rece the amount of returned sand as soon as possible, the classifier can be temporarily lifted up to make the returned sand materials "temporarily stored" in the classification tank, so that the bulge can be eliminated faster. When the mill returns to normal, it can be put down slowly (Note: do not be too fast, otherwise a large amount of "temporarily stored" ore in the tank will overload the classifier)
in case of serious belly swelling, i.e. dead swelling, high pressure water can be injected into the mill from the feed or discharge port to loosen and dilute the materials in the mill, and then part of the water will be discharged, and then the water will be increased to accelerate the discharge
for some closed-circuit grinding processes composed of sieves, there are generally
accident pools
. When the belly bulge is serious, the coarse ore can be temporarily stored in the accident pool and then pumped back for regrinding
in the case of severe abdominal distension (such as "forward vomiting" and "backward pulling"), the grinding machine should be stopped after the treatment and the necessary inspection should be carried out: whether the spoon head falls off or is loose; Whether the feeder is loose or not; Whether the screw is sheared and whether other parts of the grinding machine are damaged.
line 2: start from Beijing station, Take Metro Line 2 (Ximen Ximen), transfer to bus 407 at Andingmen (Andingmen Huilongguan community), and reach Olympic west gate. About 16.32km
line 3: start from the west of Beijing station, take bus 104 (Beijing station west - Liufang station), transfer to bus 407 at Ditan west gate (Andingmen Huilongguan community), About 15.46 km
Route 4: start from the west of Beijing station, take No.104 bus (West of Beijing station to Wuluju), transfer to No.407 bus (Andingmen Huilongguan community) at jiangzhaikou, and get to the west of Olympic sports. About 15.15 km
bus line: Metro Line 2 → Metro Line 8, the whole journey is about 14.6km
1. Take Metro Line 2 from Beijing station, pass 7 stops, and reach Gulou Street Station
2. Walk about 330m, then transfer to Metro Line 8
3. Take Metro Line 8, pass 4 stops, and reach Olympic Center Station
4. Walk about 1.0KM, and reach Olympic Center
bus line: Metro Line 8 → Metro Line 2, the whole journey is about 14.4km
1. Walk about 800m from the National Stadium (Bird's Nest) to the Olympic Sports Center Station
2. Take Metro Line 8, pass 4 stops, reach Gulou Street Station
3. Walk about 330m, transfer to Metro Line 2
4. Take Metro Line 2, pass 7 stops, and reach Beijing station
The most convenient route from water cube to Beijing station is to take subway, which is as follows:
subway line 8 → subway line 2, the whole journey is about 14.4 km
1. Walk about 780 meters from water cube diving pool to Olympic Sports Center Station
2. Take subway line 8, pass 3 stops, and reach Gulou Street Station
3. Walk about 330 meters, then transfer to subway line 2
4 Take Metro Line 2, pass 7 stops and arrive at Beijing station
1. The best way to build a disk array card is to use RAID 0 + RAID 1
which is the combination of disk image and improving the speed of disk reading and writing
2. Select the motherboard, which is suitable for building the disk array you need
3. Other hardware doesn't need to be very good. It's mainly rable. After all, servers are rarely turned off
4. Budget multi brand servers, such as HP & # 92; Lenovo, 92; IBM\ Intel wave, etc., can also assemble their own servers, low cost
5. The system adopts win 2003 server
the specific line length and direction depend on your actual situation