MC industrial mining Backpack
Other tools needed for the use of mining machine: Mining bit, OV or od scanner
1. After preparing the above tools, power on the mining machine
2. Put the drill bit, mining pipe and OD scanner into the position of the mining machine interface as shown in the figure below. When the power supply of the mining machine is enough, mining will begin
note: before the scanner, set the blacklist (that is, you don't want to collect) or white list (ore must be put in it), and then select accurate collection or inaccurate collection
extended data
mining machine is a kind of automatic vertical mining machine. Placing a box beside you can automatically put the collected items into the box. The power consumption of mining opportunities varies according to the internal components (one-time excavation) - mining bits: 450eu ~ 470eu
diamond bit: 880eu ~ 900eu; Od detector: 45eu ~ 75eu; OV detector: 165eu ~ 190eu. The maximum input voltage is 32eu / T, which will explode. The components in the mining machine include: drill, scanner and mining pipe. The number of pipes will be greater than or equal to 1. None of the three components will work without one
bus line: Metro Line 1 → Metro Line 5 → Minhang No.37, the whole journey is about 30.6 km
1. Walk about 520 meters from Shanghai to people's Square Station
2. Take Metro Line 1, pass 12 stops, and reach Xinzhuang station
3. Take Metro Line 5, pass 4 stops, and reach Beiqiao station
4. Walk about 340 meters, Arrive at humin Road (Beiqiao subway station) station of BeiSong highway
5, Take Minhang 37, pass 7 stations, and arrive at Fuguo Road Station of Yinchun road
bus line: Metro Line 1, the whole journey is about 16.4km
1. Take Metro Line 1 from Hadong station, pass through 16 stations, and reach hada station
2. Walk about 630m to the Academy of Agricultural Sciences
train number: Line 7
Agricultural Science Center Bus Terminus - bus stop
train number: No. 73; No. m312
Donghai Experimental Primary School - bus stop
No. 108; B611 Road