Position: Home page » Equipment » Certificate for mining

Certificate for mining

Publish: 2021-05-18 02:49:41
1.

According to the "mineral resources law" and "measures for the administration of mineral resources mining registration", the examination and approval of mining right and the acquisition of mining license are divided into the following two proceres: delimitation of mining area and acquisition of mining license

1. Delimitation of mining area: according to Article 32 of the measures for the administration of mining registration of mineral resources, the mining area refers to the three-dimensional space area that is legally delimited by the registration authority for the exploitation of mineral resources, the distribution scope of shaft and roadway engineering construction or the open-pit stripping scope

2. The scope of mining area is the space area for the mining right holder to engage in mining activities and fulfill the rights and obligations granted by law. Therefore, the delimitation of the mining area is the premise for the applicant to engage in all the preliminary work of mine construction

As the first step in the mining right examination and approval process, the scope of mining area should be delimited by the mining registration authority. The specific work is divided into the following three sequences

the applicant of mining right puts forward the application of delimiting the scope of mining area: according to the license issuing authority stipulated in the mining registration method and the authorization of the competent department of Geology and mineral resources to the provincial (District, city) competent department of Geology and mineral resources for the examination and approval of mining right, the applicant will submit the application data of delimiting the scope of mining area to the mining registration administration for examination

extended information:

Article 6 of the mineral resources law of the people's Republic of China

the registration administration organ shall make a decision on whether to approve or not to register within 40 days from the date of receiving the application, and notify the applicant of the mining right

If it is necessary for the applicant of mining right to modify or supplement the materials specified in Article 5 of these measures, the registration administration organ shall notify the applicant of mining right to modify or supplement within a time limit

if the registration is approved, the mining right applicant shall, within 30 days from the date of receiving the notice, pay the fee for the use of the mining right in accordance with Article 9 of these measures, pay the price of the mining right formed by the state funded exploration in accordance with Article 10 of these measures, go through the registration proceres, obtain the mining license, and become the mining right holder

In case of no registration, the registration authority shall explain the reasons to the mining right applicant

Article 7 The term of validity of mining license shall be determined according to the scale of mine construction: for large-scale or above, the longest term of validity of mining license shall be 30 years; For medium-sized ones, the mining license is valid for up to 20 years

for small-scale mining, the maximum validity period of mining license is 10 years. If it is necessary to continue mining after the expiration of the mining license, the mining right holder shall go through the registration formalities at the registration administration organ 30 days before the expiration of the mining license

if the mining right holder fails to go through the renewal registration proceres within the time limit, the mining license shall be automatically annulled

2.

1. Filing documents of reserve evaluation, geological data collection certificate, occupied reserve registration certificate and geological exploration report (including attachments)

2. Approved mining area map and approval documents for delimiting mining area

3. Mineral resources development and utilization plan and evaluation opinions

4. (EIA) mine geological environment impact assessment report and confirmation opinion, EIA reply

5. Mine geological environment protection and ecological restoration management plan and approval documents, ecological management reserve deposit notice and payment receipt (issued by the financial department of Jilin Provincial Department of land and resources)

6. Land reclamation plan and record form

7. Payment materials of mining right price (exemption from the transfer of exploration right to mining right)

8. (safety assessment category) mine preliminary design, safety pre price report, non coal mine construction safety permission letter

3. 1. Filing documents of reserve evaluation, geological data collection certificate, occupied reserve registration certificate and geological exploration report (including attachments)
2. Approved mining area map and approval documents for delimitation of mining area
3. Mineral resources development and utilization plan and evaluation opinions
4. (EIA) mine geological environment impact assessment report and confirmation opinion, EIA reply
5. Mine geological environment protection and ecological restoration management plan and approval documents, ecological management reserve deposit notice and payment receipt (issued by the financial department of Jilin Provincial Department of land and resources)< 6. Land reclamation plan and record form
7. Payment materials for the price of mining right (exemption from the transfer of exploration right to mining right)
8. (safety assessment) mine preliminary design, safety pre price report, non coal mine construction safety permission letter
there are more specific requirements on the websites of land and resources departments of all provinces. I don't know what stage you have reached in applying for mining license? Is it a row? Or the grant of mining rights.
4. 1 Data to be submitted: 1; 2. The reviewed reserves report and development plan of the mining area; 3. Application form for indivial mining registration (opinions shall be signed in the opinion column and stamped with corresponding official seal); 4. Environmental impact assessment report of construction project; 5. A of the application for mining registration and the ID card of the mining right applicant; 6. According to the paid way, through bidding, auction and listing, obtain the relevant information of the mining qualification of the application area according to law; 7. Taihe County non coal mine safety pre evaluation review opinion; 8. Other materials submitted as required 2 Processing proceres and time limit proceres: submit the application → the preliminary examination by the land and resources department meets the conditions for setting up the mining area → determine the grantee of the mining right through bidding, auction and listing → the grantee submits the mining registration data and signs the mining right transfer contract → the grantee pays the relevant fees → issue the mining license time limit: the grantee who obtains the mining right through bidding, auction and listing, Within 30 days, the application materials shall be submitted to the land and resources department, the mining right transfer contract shall be signed, and the relevant fees shall be paid. The land and resources department shall handle the registration proceres and issue the mining license within 20 days.
5.

Certificates required for mining (take Hunan Province as an example):

1. Application report and application registration form for mining right (original version)

2. Business license of enterprise legal person (, original )

3. Approval documents for delimiting mining area (original version)

4. Review opinions of municipal and county land and resources departments (original version)

5. Opinions of safety supervision and management department (original version)

6. Environmental impact assessment report approval document (, original )

7. Mineral resources reserve report and record certificate (original version)

8. Mineral resources development and utilization plan and record certificate (original version)

9. Mine geological environment impact assessment report and review and confirmation form (original version)

10. Mining right price evaluation report and record certificate (original) or paid disposal certificate of exploration right (, original)

11. Qualification certificate of funds and technical personnel (original or )

Other materials required by the mining registration authority

note: the above information shall be submitted in paper and electronic form, and the paper documents shall be arranged in order, the shall be signed by the ing unit, the paper documents shall be scanned into electronic pictures in PDF format, and the electronic newspapers in PKG format shall be made according to the corresponding newspaper types

proceres required for mining (taking Hunan Province as an example):

1. Acceptance

1. Person in charge of the post: acceptance personnel of the Department of government affairs center

2. Post responsibility and authority: check the application materials according to the acceptance standards. The application materials that meet the standards shall be accepted immediately; The application materials that do not meet the standards will not be accepted

Time limit: immediate

2. Review

1. Preliminary examination

(1) person in charge of post: handling personnel of mine management department, geological exploration department, finance department (Xinli), petition office and mineral law enforcement Department

(2) post responsibilities and authority:

1. Mine management department, geological exploration department, finance department (Xinli), petition office and mineral law enforcement department shall, in accordance with the approval conditions and standards, Joint examination of bidding materials (10 working days)

② according to the opinions of the relevant audit office, the handling personnel of the mine management office put forward preliminary review opinions and submitted them to the person in charge of the office for review (3) time limit: 19 working days

(1) person in charge of the post: person in charge of the mine management department (2) post responsibilities and authority:

1. The deputy director of the mine management department reviews the review opinions of the preliminary review operator according to the approval conditions and standards (7 working days)

② the director of the mine management department shall review the application materials after review. For the qualified bidding materials, put forward the approval opinions, and report to the leader of the Department in charge for decision; For the unqualified application materials, put forward the audit opinions of disagreement, and report to the leader of the Department in charge for decision (3) time limit: 14 working days

1. Person in charge of the post: leader of the Department in charge of the post 2. Post responsibilities and authority:

1. Examine and approve the application materials and examination opinions according to the examination and approval conditions and standards

(2) sign the approval opinions for those meeting the conditions and standards; If it does not meet the legal conditions, it shall sign the opinion of disapproval

Time limit: 7 working days

4. Completion notification 1. Person in charge of the post: the handling personnel of the administrative center of the Department 2. Post responsibility and authority: inform the applicant of the decision

extended data:

license basis for mining (taking Hunan Province as an example):

(1) mineral resources law of the people's Republic of China

(2) detailed rules for the implementation of mineral resources law of the people's Republic of China

(3) measures for the administration of mineral resources mining registration

(4) mineral resources management regulations of Hunan Province (5) Regulations on the registration conditions of mineral resources exploitation in Hunan Province: according to the mineral resources law of the people's Republic of China, the measures for the administration of mineral resources exploitation registration, the measures for the administration of the use fee and price of exploration right and mining right, the Interim Measures for the Administration of the price of exploration right and mining right in Hunan Province "Hunan Province mine geological environment management provisional measures" and other relevant provisions

license quantity: no quantity limit

legal period: 40 working days

commitment period: 40 working days (approved by the provincial government examination and reform office according to the legal period)

mining license conditions (taking Hunan Province as an example):

(1) the applicant is an enterprise legal person with independent civil liability capacity

(2) it meets the relevant conditions stipulated in the State Council Order No. 152 and order No. 241

(3) the qualification requirements specified in the regulations of Hunan Province on the registration conditions of mineral resources exploitation (No. 257 order of the provincial government)

reference: Wangcheng District Bureau of land and resources - mining mineral resources approval and operation process

6. Mining license + safety proction license, starting from the land department, involves forestry, water conservancy, public security, environmental protection, safety supervision and other departments.
7. Reference answer My whole life in the study, sitting here, feel the inner peace
8. The five licenses and one license are as follows:
mining license: handled by Provincial Bureau of land and resources
XX safety license: handled by Provincial Bureau of coal supervision
XX proction license: generally handled by provincial department in charge of coal instry
mine manager qualification certificate: Provincial Department of coal management
mine manager safety qualification certificate: Provincial Bureau of coal supervision
business license: Instrial and commercial department
mining license must be handled first, Then there is the safety license. After the proction conditions are met, the coal proction license will be issued after the acceptance
the certificate of mine manager has to wait for the training plan of the province, once a year
the application proceres should be from the district and county level, and the proceres are relatively perfect and formal.
9.

Certificates required for coal mining: mining license, safety proction license, coal proction license, mine manager qualification certificate, mine manager safety qualification certificate and business license

Mining license is the legal evidence for the mining right holder to exercise the right to exploit mineral resources. A license certificate issued by the mining registration administration organ to grant the mining right applicant the right to exploit mineral resources. The mining right license shall be uniformly printed by the competent department of land and resources under the State Council and issued by the competent department of land and resources at all levels according to the statutory authority

the safety proction license is a necessary certificate for construction enterprises to carry out proction and construction, which is linked with the enterprise qualification. Enterprises that have obtained the construction qualification certificate must apply for the safety proction license before they can carry out the bidding work to take over the corresponding projects

extended data:

the Ministry of land and resources issued an announcement to solicit opinions from the public on the notice of the Ministry of land and resources on
relevant matters concerning the improvement of mineral resources mining registration and management (Draft for comments)

the draft has made provisions in three aspects:

one is to improve the management of delimiting the scope of mining area. The determination of the mining area should conform to the mineral resources planning; It should be based on the mineral
resource reserve report reviewed and filed. After the scope of the mining area is determined, the registration authorities at all levels will no longer accept other new mining right
applications within the scope of the mining area. The reserve period within the mining area shall not exceed 8 years for large mines and 4 years for medium and small mines

The second is to standardize the registration management of new establishment and extension of mining rights. The application for mining right should have the qualification of enterprise legal person. Except for three cases,
the vertical projection range of new mining right and established mining right shall not overlap. In principle, the newly established and extended mining license of mining right is granted 30 years, 20 years and 10 years validity according to the scale of mine construction

The third is to standardize and improve the registration management of mining right change. In case of any of the following circumstances, the registration of transfer and change of mining right shall not be handled:

1

According to the national instrial policy or mineral resources planning, the mines should be closed

3. According to the relevant national regulations, it belongs to the forbidden mining area

4

5. The mining right is put on file for investigation by the competent department of land and resources, sealed up and detained by the court, or notified by the public security, audit, tax, procuratorial and other authorities that it cannot be transferred and changed. In principle, the mining right should not be separated. If it is necessary to be separated e to the change of mining conditions and other special reasons, it should conform to the division of mining right setting. The mining rights of the third kind of minerals shall not be separated

10. 1. Blasting Engineer class II, class I constructor
2, national registered mining engineer
3, national registered safety engineer

the above certificate examinations all need to apply for qualifications, the most important two are ecation and work experience
those with the above certificates are senior talents
in addition, assistant mining engineer, mining engineer and senior Mining Engineer belong to professional titles, which are related to ecational background and work experience, and do not need to take an exam.
Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750