Position: Home page » Equipment » My world gray void miner

My world gray void miner

Publish: 2021-05-17 13:04:13
1. First make an assembly rod, then right-click the mining machine with the assembly rod, and he will build it automatically, provided the backpack has materials
2.

Other tools needed for the use of mining machine: Mining bit, OV or od scanner

1. After preparing the above tools, power on the mining machine

2. Put the drill bit, mining pipe and OD scanner into the position of the mining machine interface as shown in the figure below. When the power supply of the mining machine is enough, mining will begin

note: before the scanner, set the blacklist (that is, you don't want to collect) or white list (ore must be put in it), and then select accurate collection or inaccurate collection

extended data

mining machine is a kind of automatic vertical mining machine. Placing a box beside you can automatically put the collected items into the box. The power consumption of mining opportunities varies according to the internal components (one-time excavation) - mining bits: 450eu ~ 470eu

diamond bit: 880eu ~ 900eu; Od detector: 45eu ~ 75eu; OV detector: 165eu ~ 190eu. The maximum input voltage is 32eu / T, which will explode. The components in the mining machine include: drill, scanner and mining pipe. The number of pipes will be greater than or equal to 1. None of the three components will work without one

3. The specific usage of mod mining machine is as follows:
1. The first one is the main machine. There are three positions to open the machine interface. The left drill bit saves electricity, or the diamond drill consumes electricity
2. The middle drawing pipeline
, the right drawing pipeline
od
or ov
, OD scans the area of 5x5 to save electricity, and the iron ore in
ov
9x9 consumes electricity
3. It's better to put a pump on the side of the pump, in which the emptying bucket can only come up when it meets the magma energy,
it's better to use the magma generator
to basically supply his electricity.
4. If gt6 really swallows MEK generator, it should be for balance. The compatibility of MEK is very strong. You can use EU to supply power to MEK machine (or energy storage equipment).
5. You said that this kind of ore is not available in the ordinary version. This kind of ore is only available after mod is added. If you want to dig this kind of ore, you can dig up anywhere. It depends on your luck. Mining luck accounts for the majority. The mod of the ore can be downloaded from the bus stand-alone and wheat block.
6. You make an assembly rod, put out the core and click it. It will swing by itself. If there is not enough material in the backpack, it will prompt you. Under the lens of the mining machine, there are Bedrock (unlimited height, you can swing by yourself) and void
7.

8.

The eighteen character policy for the construction of underground tunnel is as follows: pipe overtopping, strict grouting, short excavation, strong support, early closure and frequent measurement

The construction of tunnel and underground engineering has the following characteristics:

1

(2) poor working conditions, narrow working face and poor working environment

(3) subsurface excavation has little influence on the ground, but it may lead to ground subsidence when buried shallowly

(4) a large amount of waste soil and gravel should be properly treated

the construction method of tunnel and underground engineering was originally the method of mine development roadway, so it is called mining method, which has a wide range of applications

extended data:

construction method

(I) full face excavation method

1. Full face excavation method is suitable for tunnel construction with stable soil and small section, and suitable for manual excavation or small machinery operation

The full face excavation method adopts one-time excavation from top to bottom, excavation along the contour, one-time footage according to the construction scheme and early support in time

The advantage of full face excavation method is that it can rece the number of disturbance to surrounding rock, which is concive to the formation of natural bearing arch of surrounding rock, and the process is simple; The disadvantage is that the geological conditions are strict, and the surrounding rock must have enough self stability

The bench excavation method is suitable for tunnel construction in good soil quality, weak surrounding rock and Quaternary sedimentary strata

The bench excavation method divides the structural section into more than two parts, that is, two working faces or several working faces. According to the formation conditions and mechanical conditions, bench method can be divided into normal bench method and middle wall bench method. The positive step method can close the support earlier, which is helpful to control the structural deformation and the land subsidence

The bench excavation method has the advantages of sufficient working space, fast construction speed, flexibility and strong applicability

9. There are shield method and mining method for underground tunnel excavation
the shield method is to use the shield machine (like a cylinder, with a cutter head in front, which can rotate and break rocks. The shield machine also has a propulsion system) to advance the excavation underground, and support the excavation at the same time. The support is spliced with prefabricated reinforced concrete segments, and the thickness of the segments is generally about 30-100cm, The thickness of segment varies with the grade of surrounding rock
the mining method is to use a drilling machine to drill holes in the rock (it depends on the situation before drilling. If the surrounding rock is not good, you need to drill a small pipe or pipe shed in advance. As for what is a small pipe or pipe shed, you can go to the network to name it), then put explosives (usually detonators) in the hole, and then transport the stones and soil out of the hole with excavators and other machines, and then spray concrete in the hole, The anchor rod is driven, and then the second lining is made
it's almost like this. I'll type it word by word. Give me extra points. If you don't understand, just let me know. I'm a subway repairer.
Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750