2. Tunnel construction method:
arch first and then wall method
funnel scaffolding method
bench method
full section method
upper and lower pilot pit wall first and then arch method
mushroom shaped method
side pilot pit wall first and then arch method
blasting excavation method
mining method
arch first and then wall method
also known as supporting top arch method. In the soft rock with poor stability, in order to ensure the construction safety, the arch section is excavated and the top arch is built to support the top surrounding rock, and then the lower section is excavated and the side wall is built under the protection of the top arch. Before excavating the rock layer of the side wall, the top arch must be well supported, so it has the above nickname. When excavating the rock layer of the side wall on both sides (commonly known as the digging horse mouth), it must be carried out in staggered sections on the left and right, so as to avoid the top arch hanging and sinking< The method of funnel scaffolding is also called the method of heading from wall to arch. It is suitable for hard and stable rock stratum. During the construction, the lower heading shall be excavated first, and the reverse bench excavation shall be carried out from the bottom to the top of the heading until the vault; Then, the bench excavation is made from top to bottom on both sides to the bottom of the side wall; After the full section is excavated, the lining is constructed from the side wall to the top arch< Step method can be divided into positive step method and reverse step method. ① When constructing in the rock stratum with poor stability, the whole tunnel section is divided into several layers, and the excavation is carried out from the top to the bottom. The front and back distance of each layer is small, and several positive steps are formed. ② The anti bench method is applied to the construction in the rock stratum with good stability. The whole tunnel section is also divided into several layers. At the bottom of the tunnel, a wide lower heading is excavated first, and then the excavation is expanded from the bottom to the top (Fig. 3b). When drilling holes in the upper layer, a working platform or a funnel shed should be set up, which can be used for loading ballast
full section method
the whole section is excavated at one time. It is suitable for medium and small section tunnels in good rock stratum. This method can use large machinery, such as rock drilling jumbo, large ballast loader, trough Jumbo or shuttle car, formwork jumbo and concrete pouring equipment for comprehensive mechanized construction. The appearance of NATM expands the application scope of full section method and step method
the method of wall first and arch later in the upper and lower heading is also called full section excavation method (Fig. 4). In the past, in order to improve the quality of lining in the soft rock stratum with poor stability, the construction method of excavating the whole section by parts first, and then building the lining in the order of wall first and arch second was used. When using this method to excavate, it needs to use a lot of timbers to support, and it needs to be replaced many times. The construction is difficult and unsafe, so it has not been used in China
mushroom shaped method
a hybrid scheme is formed by combining the characteristics of arch first and then wall method and funnel scaffolding method. After excavating 1 to 4 parts, the mushroom shaped cross section appears, so it is named. The funnel shed is set up in the lower heading for the purpose of expanding the excavation upward. At the same time, when the geological conditions of the arch are poor, the top arch can be built first to ensure the construction safety. This method has the advantage of easily changing to other methods. When the rock stratum is bad, it is changed to arch first and then wall method. When the rock stratum is good, it is changed to funnel scaffolding method. In China, it was first used in the construction of railway tunnels with stable rock strata, and then used to build large section caverns, creating favorable conditions for recing the setting up of formwork and the materials required, and speeding up the construction progress
the method of sidewall heading from wall to arch is also called core support method. When constructing a long-span tunnel in a very soft and unstable stratum, in order to ensure the safety of construction, it is necessary to excavate along the periphery of the tunnel by sections, and then graally build the lining from the side wall to the top arch to prevent the collapse of the stratum. During excavation, both temporary support and arch frame can be supported on the large core stratum not excavated in the middle of the tunnel. Under the protection of lining, the core can be removed finally, and the invert can be built if necessary
blasting excavation
the blasting requirements of tunnel and underground engineering construction are different from those of general rock engineering. In order to facilitate the loading of ballast, not to damage the temporary support or permanent lining nearby, not to make the rock burst into pieces or the broken rock block too large, and not to throw the rock block far away ring blasting, loose blasting is generally used. A blasting cycle is composed of drilling, charging, sealing, blasting, smoke exhaust, temporary support and mucking. Drilling and mucking take up most of the time and should be mechanized, such as using rock drill, mucking machine, mining traction locomotive, etc<
mining method
refers to the construction method of constructing tunnel by excavating underground tunnel. Mining method is a traditional construction method. Its basic principle is that after the tunnel excavation, affected by blasting, the rock mass will break and form a relaxed state, which may collapse at any time. Based on the theoretical basis of this relaxation load, the construction method is to adopt the segmented excavation one by one according to the sequence of parts, and the excavation and support are required for safety, so the support is complex and the timber consumption is large. With the emergence of shotcrete and anchor support, the number of parts is reced, and then the NATM is developed.
arch first and then wall method
funnel scaffolding method
bench method
full section method
upper and lower pilot pit wall first and then arch method
mushroom shaped method
side pilot pit wall first and then arch method
blasting excavation method
mining method
arch first and then wall method
also known as supporting top arch method. In the soft rock with poor stability, in order to ensure the construction safety, the arch section is excavated and the top arch is built to support the top surrounding rock, and then the lower section is excavated and the side wall is built under the protection of the top arch. Before excavating the rock layer of the side wall, the top arch must be well supported, so it has the above nickname. When excavating the rock layer of the side wall on both sides (commonly known as the digging horse mouth), it must be carried out in staggered sections on the left and right, so as to avoid the top arch hanging and sinking< The method of funnel scaffolding is also called the method of heading from wall to arch. It is suitable for hard and stable rock stratum. During the construction, the lower heading shall be excavated first, and the reverse bench excavation shall be carried out from the bottom to the top of the heading until the vault; Then, the bench excavation is made from top to bottom on both sides to the bottom of the side wall; After the full section is excavated, the lining is constructed from the side wall to the top arch< Step method can be divided into positive step method and reverse step method. ① When constructing in the rock stratum with poor stability, the whole tunnel section is divided into several layers, and the excavation is carried out from the top to the bottom. The front and back distance of each layer is small, and several positive steps are formed. ② The anti bench method is applied to the construction in the rock stratum with good stability. The whole tunnel section is also divided into several layers. At the bottom of the tunnel, a wide lower heading is excavated first, and then the excavation is expanded from the bottom to the top (Fig. 3b). When drilling holes in the upper layer, a working platform or a funnel shed should be set up, which can be used for loading ballast
full section method
the whole section is excavated at one time. It is suitable for medium and small section tunnels in good rock stratum. This method can use large machinery, such as rock drilling jumbo, large ballast loader, trough Jumbo or shuttle car, formwork jumbo and concrete pouring equipment for comprehensive mechanized construction. The appearance of NATM expands the application scope of full section method and step method
the method of wall first and arch later in the upper and lower heading is also called full section excavation method (Fig. 4). In the past, in order to improve the quality of lining in the soft rock stratum with poor stability, the construction method of excavating the whole section by parts first, and then building the lining in the order of wall first and arch second was used. When using this method to excavate, it needs to use a lot of timbers to support, and it needs to be replaced many times. The construction is difficult and unsafe, so it has not been used in China
mushroom shaped method
a hybrid scheme is formed by combining the characteristics of arch first and then wall method and funnel scaffolding method. After excavating 1 to 4 parts, the mushroom shaped cross section appears, so it is named. The funnel shed is set up in the lower heading for the purpose of expanding the excavation upward. At the same time, when the geological conditions of the arch are poor, the top arch can be built first to ensure the construction safety. This method has the advantage of easily changing to other methods. When the rock stratum is bad, it is changed to arch first and then wall method. When the rock stratum is good, it is changed to funnel scaffolding method. In China, it was first used in the construction of railway tunnels with stable rock strata, and then used to build large section caverns, creating favorable conditions for recing the setting up of formwork and the materials required, and speeding up the construction progress
the method of sidewall heading from wall to arch is also called core support method. When constructing a long-span tunnel in a very soft and unstable stratum, in order to ensure the safety of construction, it is necessary to excavate along the periphery of the tunnel by sections, and then graally build the lining from the side wall to the top arch to prevent the collapse of the stratum. During excavation, both temporary support and arch frame can be supported on the large core stratum not excavated in the middle of the tunnel. Under the protection of lining, the core can be removed finally, and the invert can be built if necessary
blasting excavation
the blasting requirements of tunnel and underground engineering construction are different from those of general rock engineering. In order to facilitate the loading of ballast, not to damage the temporary support or permanent lining nearby, not to make the rock burst into pieces or the broken rock block too large, and not to throw the rock block far away ring blasting, loose blasting is generally used. A blasting cycle is composed of drilling, charging, sealing, blasting, smoke exhaust, temporary support and mucking. Drilling and mucking take up most of the time and should be mechanized, such as using rock drill, mucking machine, mining traction locomotive, etc<
mining method
refers to the construction method of constructing tunnel by excavating underground tunnel. Mining method is a traditional construction method. Its basic principle is that after the tunnel excavation, affected by blasting, the rock mass will break and form a relaxed state, which may collapse at any time. Based on the theoretical basis of this relaxation load, the construction method is to adopt the segmented excavation one by one according to the sequence of parts, and the excavation and support are required for safety, so the support is complex and the timber consumption is large. With the emergence of shotcrete and anchor support, the number of parts is reced, and then the NATM is developed.
3.
line 3 to line 5
4. The nearest one is line 3 to dabushu station. It's a long way to go. If you change trains, it's the most convenient to transfer at Quyang Road station. Take 848 at Dalian West Road Station on Quyang Road and go back to dabushu station
5.
Get off at Quyang Road Station of Metro Line 8, exit at exit 6 and head north
6. From
Guangzhou East Railway Station
walk about 80 meters to Guangzhou east railway station, take long line 41 (4 stops), road 506 (5 stops), peak express line 24 (3 stops), peak express line 28 (less flights) (4 stops) 508 express line (less flights) (take 7 stops) to Guangyuan
Tianshou
crossroad east station (original
Guanggong
Wushan Campus Station) transfer to
University City Line 1
(take 3 stops) to Tang'an Road Station (
Keyun road
). Walk about 310 meters to Haohan business center, 6.8 kilometers, 21 yuan
Guangzhou East Railway Station
walk about 80 meters to Guangzhou east railway station, take long line 41 (4 stops), road 506 (5 stops), peak express line 24 (3 stops), peak express line 28 (less flights) (4 stops) 508 express line (less flights) (take 7 stops) to Guangyuan
Tianshou
crossroad east station (original
Guanggong
Wushan Campus Station) transfer to
University City Line 1
(take 3 stops) to Tang'an Road Station (
Keyun road
). Walk about 310 meters to Haohan business center, 6.8 kilometers, 21 yuan
7. 1. No matter how many beautiful clothes you see in a day, you will never forget the one that gives you the feeling of electric shock. Falling in love with famous brand clothing is not a simple vanity, it reflects your taste and identity. Located on the first floor of China Hotel, the famous store city is a famous leisure and shopping place in Guangzhou, close to zhaoxiu Park Station of Metro Line 2. There are hundreds of world-class famous brand shops in the city, including Gucci, Louis Vuitton, Burberry, Fendi, Ferragamo, Hugo Boss and so on, which can meet the needs of people with different tastes. The catering and entertainment facilities in China Grand Hotel make it easier for you to go shopping and enjoy the delicacy of Cantonese cuisine in various restaurants, or a wide variety of special food from all over the world. It's an ideal place for shopping, catering and entertainment, which will surely make you enjoy yourself. 2. Swimming life experience: Zhonghua square address: Zhongshan Third Road, this is a paradise for the young generation, to experience the trend of life, here is a must visit. When you go to the fashion stores on the first floor, the young people like s2sqare, S & K, Baleno and other brand stores will take turns to wear new clothes. Soon, you will be able to integrate into the wonderful colorful world of temples and Liying neon clothes, and become a fashion trendsetter. For the new generation, how can we lack the knowledge of high technology? The fourth floor of China square is the China Digital City with the latest technology in the market. All kinds of new digital procts and mobile phones first land here, so that you can always walk on the cutting edge of the times. On the eighth floor, you can go to the five-star movie theater to enjoy the wonderful movies or the world-class limijian fitness club. Tired, hungry, and then to the seventh floor of the food concentration camp to enjoy the delicious. Come on, this is where our trend is concentrated. 3. Home furnishing aircraft carrier: Meiju Center Address: No.68 West Huangpu Avenue, middle Huacheng Avenue, Pearl River New Town (abce block). Meiju center is one of the few large home furnishing centers in Guangzhou. More than 400 famous brands have established the status of "home furnishing aircraft carrier" in South China, and it is also the "gold mine" for most white-collar workers to build their homes in Guangzhou, The center is equipped with transparent ceiling and natural lighting. The garden layout makes people feel like wandering in the park. However, the furniture and ornaments here are full of the gorgeous atmosphere of the city. Whether it is simple, warm, complex and cold, the urban trend is the mainstream. Walking in different styles, you will be glad to come to such a prosperous dreamer and experience different living environments, such as Canada's "celebrity", Germany's "hansgeya", Italy's "gorgeous map", "Anbo", America's "Braun", Japan's "InaI", "Douglas" and Hong Kong's "Dilang" "Huayida" and other well-known brands are the first choice of fashion people, the representative of the quality of life. 4, date new life: New World Trade address: 371-375 world road, Guangzhou World Trade Center, become an independent school in the business circle. Its independent shop in shop makes people feel at hand with the latest fashion in the world. The collection of high-end stores and world-famous clothing brands makes it one of the top commercial buildings in South China. Via Spiga imported from Italy, Giada and episode, German brand "Betty Bailey", etc. all have sales stores here. We can't catch sight of all kinds of world-famous brand stores. Elegant evening dress, romantic light sandals... All reflect the style of all over the world. This makes us feel the pulse of the world trend while shopping. People who stand on the top of the trend look at the scenery shoppers. They can best interpret the fashion trend.
8.
Subway entrance generally has subway line
road map marking, driving through the station
, according to the place you want to go
, find the line or directly ask the conctor at the ticket exit. Personal
suggestions are for reference only< br />
9. The subway is divided into many lines, such as line 1, line 2, line 4, line 5, line 6 and so on. As for the number of lines you need to take, it depends on where you go from.
Hot content