Source mining procedure
Publish: 2021-05-16 19:33:04
1.
Ha Yu miner
you can mine with Windows system or Linux system
Windows system mining, directly download the installation software, and then one click mining, here's about Linux system mining
to use the Linux system for mining, it only needs two steps to use the services of Harbin fish miner
< UL >open the website, enter the mobile phone number, select how many CPUs you want to use to mine, the default is to use 50% CPU to mine, click to generate your exclusive command and
only two steps, you can mine on Linux system, the money you dig only needs to go to the website of hayu miner, enter your mobile phone number to withdraw
2. Hehe, 360 is easy to use. Now I use 360 and super magic rabbit
if the process
magic rabbit is more practical
you can see all the processes in the process option of magic rabbit
the system process is green and marked as system process, other processes are black, and the location of the file of that process in your computer is displayed, And right click the process, there will be online check the process information, a little open, there is a very clear label, such as: whether it is a Trojan horse, whether it is an error, whether it is a background process, whether it occupies memory, whether it is a spy, and a series of instructions.
if the process
magic rabbit is more practical
you can see all the processes in the process option of magic rabbit
the system process is green and marked as system process, other processes are black, and the location of the file of that process in your computer is displayed, And right click the process, there will be online check the process information, a little open, there is a very clear label, such as: whether it is a Trojan horse, whether it is an error, whether it is a background process, whether it occupies memory, whether it is a spy, and a series of instructions.
3. It is not recommended to enter now. Now it's more and more difficult to dig the mine. Professional mining machines are difficult to break even, let alone personal computers.
4. Mining software is the algorithm of bitcoin. Bitcoin mining machine is the computer used to earn bitcoin.
5. 1. (1) the application for the scope of the prescribed mining area< (2) geological reports approved by relevant departments< 2. Materials to be submitted in application for mining right (1) application registration form and mining area map< (2) original business license and credit certificate< (3) mineral resources development and utilization plan and approval documents< (4) the original approval documents for the establishment of mining enterprises in accordance with the law< (5) environmental impact assessment report and approval documents of mining mineral resources< (6) confirmation of mining right evaluation results and documents of rection and exemption of price and royalty< (7) declaration and registration form of occupied mineral reserves< (1) application for renewal and change of mining right
(2) review opinions of the state (prefecture, city) and county (city, administrative committee) on extension and change< (3) application for registration of renewal and change< (4) original and plicate of the original mining license< 4. Materials to be submitted for the transfer of mining rights (1) application for transfer< (2) the assignment contract signed by the assignor and the assignee
(3) the qualification certificate of the transferee< (4) written materials issued by the original certification authority that the transferor meets the transfer conditions< (5) report on mineral resources exploitation< (6) at the same time, the state-owned mining enterprises shall submit the approval documents of the competent authorities for the transfer of mining rights< (7) for the transfer of mining rights funded by the state, the confirmation of mining right evaluation results and the documents of price rection and exemption shall be submitted< (8) if the mining right is transferred again, a of the approval document of the previous transfer shall be submitted< (9) if the transferred mining right is not funded by the state, the transfer applicant shall submit the relevant investment certificate< (10) original and plicate of mining right license< (1) newly established mining right is 40 days< (2) renewal of mining right for 30 days< (3) transfer the mining right for 40 days< (1) the price of mining right is charged according to the price confirmation and rection documents< (2) mining right royalty: 1000 yuan per square kilometer according to mining area< (3) registration fee: 500 yuan for large mines, 300 yuan for medium mines and 200 yuan for small mines.
(2) review opinions of the state (prefecture, city) and county (city, administrative committee) on extension and change< (3) application for registration of renewal and change< (4) original and plicate of the original mining license< 4. Materials to be submitted for the transfer of mining rights (1) application for transfer< (2) the assignment contract signed by the assignor and the assignee
(3) the qualification certificate of the transferee< (4) written materials issued by the original certification authority that the transferor meets the transfer conditions< (5) report on mineral resources exploitation< (6) at the same time, the state-owned mining enterprises shall submit the approval documents of the competent authorities for the transfer of mining rights< (7) for the transfer of mining rights funded by the state, the confirmation of mining right evaluation results and the documents of price rection and exemption shall be submitted< (8) if the mining right is transferred again, a of the approval document of the previous transfer shall be submitted< (9) if the transferred mining right is not funded by the state, the transfer applicant shall submit the relevant investment certificate< (10) original and plicate of mining right license< (1) newly established mining right is 40 days< (2) renewal of mining right for 30 days< (3) transfer the mining right for 40 days< (1) the price of mining right is charged according to the price confirmation and rection documents< (2) mining right royalty: 1000 yuan per square kilometer according to mining area< (3) registration fee: 500 yuan for large mines, 300 yuan for medium mines and 200 yuan for small mines.
6. According to the law of our country, mining right refers to the right to exploit mineral resources and obtain the mineral procts within the scope of mining license obtained according to law. Enterprises must obtain mining license according to law, and only when they have mining right can they obtain the right to exploit mineral resources, and their mining right can be protected by law
according to the current relevant laws and regulations in China, there are two ways to establish mining rights: one is to approve mining rights through competition; the other is to approve mining rights through competition; The second is to examine and approve the establishment of mining rights by applying
the winner or applicant who meets the required qualification conditions, after approval and going through the required proceres, obtains the mining license and becomes the mining right holder< According to the regulations of the Ministry of land and resources of the people's Republic of China on the administration of bidding, auction and listing of exploration rights and mining rights (for Trial Implementation), the establishment of new mining rights in one of the following five situations, The Department in charge of mining rights shall grant mining rights through bidding, auction and listing:
1
2
3
4
5. Other situations stipulated by the Ministry of land and resources and provincial authorities< (2) approval of application for transfer of mining rights
according to the administrative measures for bidding, auction and listing of exploration rights and mining rights (for Trial Implementation), the competent department of mining rights shall not grant mining rights by bidding, auction and listing under any of the following circumstances:
1
2. Areas that need to be mined uniformly in the upper and lower parts of the mining area with mining rights and the mining area with mining enterprises that meet the requirements of the mineral resources planning or the overall planning of the mining area
3
4. The ownership of exploration right and mining right is controversial
5. It is not suitable to award by way of bidding, auction and listing e to special circumstances as otherwise stipulated by laws and regulations and the competent department
China implements the system of paid acquisition of mining rights. When applying for the mining right of the state funded exploration and proved mineral land, the applicant of the mining right shall pay the price of the mining right formed by the state funded exploration confirmed by evaluation before obtaining the mining right
when applying to the Department of land and resources for the prospecting certificate, the customer should submit the following application materials (Note: Please bind the materials in the following order; Electronic documents are reported by U disk or mobile hard disk; The format of electronic document is word document, and the format of map is JPG)
1. Application and registration form of exploration right (original in triplicate) (Note: the application and registration form of exploration right must be filled in and saved by using the offer software of exploration right to form an electronic offer, Submit the application together with other data. Please download the software of prospecting right offer from the website of the Ministry of land and resources)
2. The applied block scope map (original, 1 ) (attached with 1 electronic document)
3. The "business license of enterprise legal person" or "certificate of institution legal person" of the applicant for exploration right is within the validity period and has been inspected annually (1 ) (1 electronic document attached)< 4. The geological exploration qualification certificate of the exploration unit is within the validity period and has been inspected (1 ) (attached with 1 electronic document)
5. Exploration contract or exploration plan (1 original) (attached with 1 electronic document)
6. Certificate of fund source of exploration project (1 original) (attached with 1 electronic document)
7. Implementation plan and appendix of exploration work (2 originals) (1 electronic document attached)
8. Traffic location map (1 ) (attached with 1 electronic file)
9. Electronic offer (1 ) (attached with 1 electronic document)
10. For foreign-related projects, the company contract and articles of association of the applicant for exploration right (1 ) (1 electronic document attached) shall also be submitted
11. For the project transferred by agreement, the relevant documents of the project transferred by agreement shall also be submitted (1 electronic document attached)
the following problems should be paid attention to when organizing the application materials of exploration certificate:
1. The application registration form of exploration right must be filled in by the application software of exploration right (the application software of exploration right can be downloaded from the website of the Ministry of land and resources)< There are two kinds of materials to be reported: one is printed and bound; The other is electronic documents. Both should be prepared at the same time. Only the printed binding is unqualified; If there is no prospecting Certificate in the electronic document, the offer is also unqualified< In addition to printing and binding according to the above requirements, all the above data should also be scanned into electronic documents (the electronic document format is word document and the drawing format is JPG), and the electronic documents should be put on U disk or mobile hard disk or CD-ROM for reporting
according to the current relevant laws and regulations in China, there are two ways to establish mining rights: one is to approve mining rights through competition; the other is to approve mining rights through competition; The second is to examine and approve the establishment of mining rights by applying
the winner or applicant who meets the required qualification conditions, after approval and going through the required proceres, obtains the mining license and becomes the mining right holder< According to the regulations of the Ministry of land and resources of the people's Republic of China on the administration of bidding, auction and listing of exploration rights and mining rights (for Trial Implementation), the establishment of new mining rights in one of the following five situations, The Department in charge of mining rights shall grant mining rights through bidding, auction and listing:
1
2
3
4
5. Other situations stipulated by the Ministry of land and resources and provincial authorities< (2) approval of application for transfer of mining rights
according to the administrative measures for bidding, auction and listing of exploration rights and mining rights (for Trial Implementation), the competent department of mining rights shall not grant mining rights by bidding, auction and listing under any of the following circumstances:
1
2. Areas that need to be mined uniformly in the upper and lower parts of the mining area with mining rights and the mining area with mining enterprises that meet the requirements of the mineral resources planning or the overall planning of the mining area
3
4. The ownership of exploration right and mining right is controversial
5. It is not suitable to award by way of bidding, auction and listing e to special circumstances as otherwise stipulated by laws and regulations and the competent department
China implements the system of paid acquisition of mining rights. When applying for the mining right of the state funded exploration and proved mineral land, the applicant of the mining right shall pay the price of the mining right formed by the state funded exploration confirmed by evaluation before obtaining the mining right
when applying to the Department of land and resources for the prospecting certificate, the customer should submit the following application materials (Note: Please bind the materials in the following order; Electronic documents are reported by U disk or mobile hard disk; The format of electronic document is word document, and the format of map is JPG)
1. Application and registration form of exploration right (original in triplicate) (Note: the application and registration form of exploration right must be filled in and saved by using the offer software of exploration right to form an electronic offer, Submit the application together with other data. Please download the software of prospecting right offer from the website of the Ministry of land and resources)
2. The applied block scope map (original, 1 ) (attached with 1 electronic document)
3. The "business license of enterprise legal person" or "certificate of institution legal person" of the applicant for exploration right is within the validity period and has been inspected annually (1 ) (1 electronic document attached)< 4. The geological exploration qualification certificate of the exploration unit is within the validity period and has been inspected (1 ) (attached with 1 electronic document)
5. Exploration contract or exploration plan (1 original) (attached with 1 electronic document)
6. Certificate of fund source of exploration project (1 original) (attached with 1 electronic document)
7. Implementation plan and appendix of exploration work (2 originals) (1 electronic document attached)
8. Traffic location map (1 ) (attached with 1 electronic file)
9. Electronic offer (1 ) (attached with 1 electronic document)
10. For foreign-related projects, the company contract and articles of association of the applicant for exploration right (1 ) (1 electronic document attached) shall also be submitted
11. For the project transferred by agreement, the relevant documents of the project transferred by agreement shall also be submitted (1 electronic document attached)
the following problems should be paid attention to when organizing the application materials of exploration certificate:
1. The application registration form of exploration right must be filled in by the application software of exploration right (the application software of exploration right can be downloaded from the website of the Ministry of land and resources)< There are two kinds of materials to be reported: one is printed and bound; The other is electronic documents. Both should be prepared at the same time. Only the printed binding is unqualified; If there is no prospecting Certificate in the electronic document, the offer is also unqualified< In addition to printing and binding according to the above requirements, all the above data should also be scanned into electronic documents (the electronic document format is word document and the drawing format is JPG), and the electronic documents should be put on U disk or mobile hard disk or CD-ROM for reporting
7. The last bus to tongxiang at Hangzhou passenger transport center is 18:35, and the first one is 17:20. Please make good use of the time and have a good trip~
8. Columbus discovered the American continent on October 12, 1492. In the spring of 1488, he first explored to the southernmost Cape of good hope in Africa. At the order of the king in 1497, he led the fleet to set out from Lisbon, bypassed the Cape of good hope, and arrived in Mozambique the next year, Zheng He's seven voyages to the West completed a great feat in human history
to sum up, Zheng He was the first navigator to explore the sea route, at least 80 years earlier than the west, and zheng he traveled for peaceful purposes, while others were all out of the pursuit of gold and spices. And the level of navigation is far from comparable, Zheng He's fleet of more than 200 ships, and other navigators up to three.
to sum up, Zheng He was the first navigator to explore the sea route, at least 80 years earlier than the west, and zheng he traveled for peaceful purposes, while others were all out of the pursuit of gold and spices. And the level of navigation is far from comparable, Zheng He's fleet of more than 200 ships, and other navigators up to three.
9. 1 hour and 5 minutes subway line 5 → 980 road
Yijing get on the bus | walk 1.08 km | 15.09 km | ticket price 4 yuan
Bibo garden in Luohu District
walk 681 meters to Yijing details
subway line 5 (Central line) (Huangbeiling Qianwan)
get on Yijing C exit
6 stations
get off Shuijing C exit
walk 49 meters, Arrive at the details of Shuijing road
980 (West square of Shenzhen East Railway Station - Buji xialilang terminus)
get on the Shuijing road
12 stops
get off the hengtemei Science Park
walk 353 meters, Details of arriving at the destination
Juyin science and Technology Instrial Park
1 hour and 12 minutes m508 → m363
get on the train in reservoir new village | walk 1.12 km | 16.36 km
1 hour and 17 minutes subway line 5 → subway line 3 → m363
Yijing get on the train | walk 1.17 km | 15.48 km | fare 4 yuan
1 hour and 18 minutes 308 → 980
Bibo garden get on the train |530 m | 16.72 km walk
1 hour and 21 minutes subway line 5 → route 977
Yijing boarding | 1.73 km | 15.23 km walk | fare 3 yuan
Yijing get on the bus | walk 1.08 km | 15.09 km | ticket price 4 yuan
Bibo garden in Luohu District
walk 681 meters to Yijing details
subway line 5 (Central line) (Huangbeiling Qianwan)
get on Yijing C exit
6 stations
get off Shuijing C exit
walk 49 meters, Arrive at the details of Shuijing road
980 (West square of Shenzhen East Railway Station - Buji xialilang terminus)
get on the Shuijing road
12 stops
get off the hengtemei Science Park
walk 353 meters, Details of arriving at the destination
Juyin science and Technology Instrial Park
1 hour and 12 minutes m508 → m363
get on the train in reservoir new village | walk 1.12 km | 16.36 km
1 hour and 17 minutes subway line 5 → subway line 3 → m363
Yijing get on the train | walk 1.17 km | 15.48 km | fare 4 yuan
1 hour and 18 minutes 308 → 980
Bibo garden get on the train |530 m | 16.72 km walk
1 hour and 21 minutes subway line 5 → route 977
Yijing boarding | 1.73 km | 15.23 km walk | fare 3 yuan
Hot content