Position: Home page » Pool » Tunnel scraper production company

Tunnel scraper production company

Publish: 2021-05-29 10:49:02
1. Xiangyang once had more than 30 slag raking machine factories, which closed down last year. Zhongliang and Shuailong are recommended as the two with the highest quality and cost performance.
2. Safety responsibilities of slag scraper operators

(1) strictly implement the relevant provisions of "coal mine safety regulations", "operation regulations" and "operation regulations", abide by the national laws and regulations on safe proction and various rules and regulations, work with valid certificates, make good use of labor protection equipment, do not work against rules, and complete various proction tasks as required, Take direct responsibility for the safety proction of the post

(2) pay attention to the operation of the slag scraper at any time ring its operation, do not make the slag scraper operate with diseases, timely and correctly analyze, judge and deal with problems, so as to nip the accident in the bud. If it can't be handled, it should immediately report to the leader truthfully, and cooperate with the relevant personnel to analyze the cause of the fault and remove the difficult fault without delay

(3) in the work, we should concentrate on the correct and careful operation of the slag scraper, pay attention to the changes of the coal seam and roof and floor, and stop the machine immediately in case of roof fall and rib spalling, so as to assist the support worker to deal with it in time

(4) ring the operation, inspection, maintenance and troubleshooting of slag raking machine, it is necessary to pay attention to relevant safety matters to ensure work safety

(5) under no circumstances should the slag scraper be operated by personnel without a license. When the slag scraper needs to stop working or replace the digging teeth or overhaul, it must be shut down according to the safety requirements

(6) in the work, we should refuse the instruction of illegal operation, and dissuade and stop others' illegal operation

(7) to actively participate in various safety activities, post technical training, improve safety awareness and skills, report accidents in time, and protect the scene

(8) have the knowledge of coal mine disaster prevention and self rescue, mutual rescue and on-site first aid, take safety and first aid measures immediately in case of accident, actively carry out self rescue and mutual rescue, prevent the situation from expanding, protect the scene, and report to the superior immediately

(9) strictly implement the on-site shift handover system. In addition to carefully filling in the operation log and accident records, the operation of the unit equipment in this shift should be told to the next shift driver in detail, so as to pay attention to the next shift processing and operation.
3. Collapse or gas explosion, may encounter these unfortunate things, no casualties should be lucky, or change the post, miners are dangerous, no more money can buy life or health.
4. Introction: Xiangyang Zhongliang Construction Machinery Co., Ltd. (Zhongliang slag raking machine) is an enterprise dedicated to research and development, proction, sales, service and training of mining equipment (slag raking machine, slag raking machine). The company is located in Xiangyang, a famous historical and cultural city with beautiful scenery and pleasant environment
legal representative: Wang Hualiang
time of establishment: November 25, 2005
registered capital: RMB 10 million
Instrial and commercial registration number: 420621000007995
enterprise type: limited liability company (invested or controlled by natural person)
address: No.45 diamond Avenue, Xiangzhou District, Xiangyang City
5. The slag raking machine proced by Hubei Hengli Engineering Machinery Co., Ltd. can be used for mining all kinds of mineral materials with proction space of (1.7 m x 1.7 m) or more, loading of lump materials in coal mine, phosphate mine, iron mine, copper mine, gold mine and other mines, as well as water, electricity and railway culvert operation. It is the most perfect combination of the operator and the conveyor, and the collection and conveying functions are integrated into one. The proction device with electric full hydraulic control system has the characteristics of safety, environmental protection, low energy consumption and high efficiency. The working efficiency can replace 30 workers, which not only greatly improves the mining efficiency, but also reces a potential safety hazard every time one underground worker is reced. It is an indispensable advanced mining equipment for mining enterprises and an alternative proct for labor and other machinery
note: the company can customize the matching equipment according to the specific requirements of customers
6.

The suitable cross section of the tyre scraper is 1.6 * 1.6m; 1.8 * 1.8m; 2 * 2m section
suitable section of rail loader: 80 type 1.8 * 1.8m; 100 type 2.5 * 2.5m; 120 type 2.4 * 2.5m; 150 type, 2.5 * 2.8m; 160 Type 3.2 * 3.2m section. The selection of this model is mainly based on the mechanical equipment used to transport ore [such as rail transport, bucket car transport, shuttle car transport, etc.]
suitable section of crawler excavator loader: 80 type 2 * 2.2m; 100 type 2.6 * 2.6m; 100 type 2.2 * 2.4; 120 type 2.3 * 2.6m; 120 type 2.8 * 2.8; 150 type, 2.5 * 2.9m; 150 type 3.5 * 3.5m; 180 type, 2.8 * 3.3m; 180 type, 3 * 4m; 180 type, 4 * 4m; 200 type 4 * 4m; 220 type 4.5 * 4.5m; 260 type 5 * 5m; 312 type, 5 * 5m; 330 type 5 * 5m section
suitable section for inclined shaft with large slope: 80 crawler type 2.4 * 2.5m section with maximum working slope of 30 degrees; The maximum working gradient of 100 crawler type 2.6 * 2.6m section is 25 degrees; 120 crawler type 2.4 * 2.4m, maximum working gradient 28 degrees; 150 crawler type 3.5 * 3.5m, maximum working gradient 28 degrees; The maximum working gradient of 4 * 4m section of 180 crawler type is 32 degrees; 120 crawler type 2.8 * 2.8m, maximum working gradient 32 degrees; The maximum working gradient of 312 crawler type 5 * 5m section is 30 degrees
the main equipment commonly used in the construction of large section or full section are as follows:
rail transportation: gantry drilling jumbo, bolt support, vertical claw or rake bucket rail type rock loader (slag loader), 10 ~ 30 cubic shuttle mine car or mining big bucket car, 12 ton or 25t traction motor car, concrete spraying machine or transport pump, steel formwork jumbo combined supporting construction
trackless transportation: 3-arm or 4-arm tire and crawler electric hydraulic rock drilling jumbo, shotcrete anchor support, anchor jumbo, bucket crawler loader, 20 ~ 25 ton mining truck or pit truck [small secondary wheel and small Dongfeng], concrete spraying machine or delivery pump, integral steel formwork jumbo
the advantages of trackless shipping are high proction efficiency, good mobility, overcoming the practical advantages of working with large slope, small turning radius, strong working force, fast speed, not subject to conditions and so on. Although the initial investment is relatively high, the construction cost is low and fast, the engineering quality is good, and the safety and environmental protection are constantly improving. It is a common construction method in underground construction

7. After the purchase of the slag raking machine, there will be a trial run of the slag raking machine. At this time, we must pay attention to some details, because these will affect the service life of the slag raking machine and the personal safety of the users in the future. The staff of yonglitong slag raking machine manufacturer will tell you some safety rules for the trial run of the slag raking machine. I hope all mining enterprises will pay attention to them Replace the hydraulic oil according to the safety manual of the slag remover, and replace it regularly. When selecting the hydraulic oil, we must select the procts that meet the national regulations, so as to prevent the lack of power of the machine caused by the fake hydraulic oil< Second, let the motor idle for 3-5 minutes before running down the well, so that there is enough heating time before the motor works, and prevent the motor from being damaged e to overload operation and high-speed operation
thirdly, in the first 100 hours of slag raking machine, it plays a crucial role in the future life of slag raking machine. Many mine owners do not pay attention to it. When they realize it later, the machine is old and the internal parts have been "injured", so no matter how you maintain it, it may be irreparable. So the maintenance of the new machine is very critical for the later use
1. Regularly check and replace the hydraulic oil of the slag scraper, and select high-quality hydraulic oil in strict accordance with the use requirements
2. Regularly check the lubricating oil of the ore raking machine, and frequently beat, change and maintain it to ensure the lubricating effect
3. Regularly check the underground and internal lines of slag raking machine, and timely replace the aging lines
4. Check all parts of the machine regularly to see if they are firm Especially whether the road joint is loose (oil leakage)
5. For the crawler slag scraper, it is necessary to regularly check whether the links of each part are loose
the correct and perfect maintenance of the new car will determine the service life of the slag remover. Therefore, when using the slag raking machine, we must fully grasp and skillfully use the maintenance knowledge of the slag raking machine.
8. Brief introction: Wuhan West Mine Mining Equipment Co., Ltd. is a joint-stock enterprise mainly engaged in R & D and proction of slagging machine, underground loader, mining locomotive, mining winch, hydraulic drill truck, scraper, mining scraper, mining transport vehicle and other tunneling machinery and mining equipment. The company is located in Wuhan, known as the "thoroughfare of nine provinces". Wuhan West Mine Mining Equipment Co., Ltd. is a joint-stock enterprise mainly engaged in R & D and proction of slagging machine, underground loader, mining locomotive, mining winch, hydraulic drill truck, scraper, mining scraper, mining truck and other tunneling machinery and mining equipment. No better honorary title has been obtained for the time being
legal representative: Wu Zhiming
time of establishment: July 8, 2011
registered capital: RMB 10 million
Instrial and commercial registration number: 420112000106676
enterprise type: limited liability company (invested or controlled by natural person)
address: 302 (13), 3 / F standard instrial building, building A32, No.96 Xifu Road, Zoumaling Street office, Dongxihu District, Wuhan City
Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750