Release of S9 mining machinery
About 96 yuan
Ant mining machine S9 how much a day to dig
S9 computing power 13.5T, the current network computing power 6.39eh/s, 1e = 1024p, 1p = 1024t, 1t = 1024g, a S9 a day to proce bitcoin is [13.5 / (6.39 * 1024 * 1024)] * 180 ≈ 0.0036btc< br />
I can't find one in a day. Now bitcoin is not what it used to be. If you think the answer has solved your problem, please adopt it. If you have any questions, please continue to ask. I hope my answer can help you. One machine a day is about 0.03, 40 machines a month is 0.03 * 40 * 30 = 36, of course, 40 mining machines also need 400000, which is not included in the electricity bill. According to the current difficulty calculation, about 0.01584 bitcoins can be g in a day. Of course, the final result of each mine is different, but it will be very close to one day. Now bitcoin is not what it used to be. Moreover, bitcoin is now banned by more and more countries. Bitcoin can't be traded in the mainland today. Now the price of ant S9 has gone up to the sky. It's eighteen thousand. It's not recommended to buy in stock. It's too long to go back to this cycle. You can consider other options
1. If all the wires have been connected, we can turn on a connected PC at this time and turn on the network neighborhood property
2. Open the local connection attribute; 3 and then open the TCP / IP protocol properties
CPU – GPU – FPGA – ASIC – mine pool. This is the development history of mining machinery instry
I hope I can help you!
The revenue of 24 hours per T is equal to 0.00021011btc, and that of an ant S9 14T is equal to 0.00294154btc.
the current price is 37500 yuan, and the daily revenue is about 110 yuan.
ant S9 consumes 34 degrees of electricity per day (with 5% error), and the electricity fee is 0.4 yuan per degree, and the electricity cost is 13.6 yuan per day, The daily profit of an ant S9 14T miner is about 110-14 = 96 yuan
Shangyu Vocational Ecation Center was established in August 2002. In 2006, Shangyu municipal Party committee and government invested 135 million yuan to build a new vocational ecation center. The new campus covers an area of more than 200 mu, with a building area of 89000 square meters. It is designed and built according to the national key vocational school standards, with perfect ecational facilities, advanced ecational equipment and first-class school running conditions. It is one of the vocational schools with a large scale in Shaoxing City. The school has 76 classes and more than 4200 students, offering more than 10 majors in mechanical and electrical, automobile repair, numerical control, mold, information technology, business, electrical, tourism, etc. At present, the school is a national key vocational school, a first-class key vocational school in Zhejiang Province, a green school in Zhejiang Province, one of the first batch of model schools for running schools according to law in Zhejiang Province, a silver award school for health promotion in Zhejiang Province, a model school for youth health ecation in Shaoxing City, and a characteristic school in Shaoxing City. At the same time, the school is also a "training base for vocational skills of China's umbrella instry" Zhejiang advanced manufacturing training base, Shaoxing farmers training demonstration base, Shangyu red flag unit. In 2006, the school was awarded as the advanced collective of Shaoxing vocational ecation by Shaoxing Municipal People's government