Mining machinery distribution
mining machinery may focus on different projects. Taking IPFs mining machine configuration as an example, the server level CPU such as amd Xiaolong 7302 is generally used; Most graphics cards are made of NVIDIA 2080ti, which can be proced in different factories; Seagate enterprise hard disk is the majority of hard disks, with large capacity, reliability and long-term operation of 7 * 24 hours
it is an alternative MLM
first of all, blockchain is a kind of chain data structure that connects data blocks in sequence according to the time sequence, and it is a kind of tamper proof and forgery free distributed ledger guaranteed by cryptography. Secondly, , the concept of blockchain is brought out through bitcoin. It is a kind of technology. How can technology be realized? It must be combined with practical application in life and create practical value before it can make money
in the MLM of blockchain, the number of mines that can be mined is related to the number of coins held. The more coins held, the higher the mining efficiency. The purpose is obvious, in order to prevent the victims from selling too early. In the mining introction of MLM, some contents of real blockchain projects are followed, but there is usually a fatal error: in the introction of MLM projects, most of them say that ERC is used. 20 token, but in fact ERC 20 token has no mining function. For MLM projects, the so-called mining is just a number in the background
therefore, blockchain is an alternative MLM strong>
详情请咨询 搜维尔
IPFs mining machine configuration, I take the interstellar Aoyun mining machine as an example, which is shown in the following aspects:
1, Linux system
at present, many IPFs mining machines on the market still use Windows system, in fact, this is a very unprofessional performance. Windows itself is designed to serve the home computer, that is to say, it will greatly rece the efficiency of mining. Moreover, Linux system has fewer vulnerabilities and higher security than windows system. That's why the interstellar Aoyun uses the Linux operating system
2. In the early stage of IPFs mining, it may not need so many hard disks. If the miner is fully loaded with hard disk, it will not only increase the cost, but also increase the loss of hard disk. And in the late insufficient, you can add and insert the hard disk in time
3. IPFs mining machine supporting hot plug technology can remove and replace the hard disk without shutting down the system and cutting off the power supply, which greatly improves the recovery ability of IPFs mining machine to cope with disasters. Rece the risk of withholding tokens
4, enterprise hard disk
IPFs mining machine is best to use enterprise hard disk, can work 7 * 24 hours, compared with ordinary hard disk, higher is not a level
2. The length of grinding span should be adapted to the separation span. If the separation span is too long, parallel configuration can be considered
3. The grinding machine of multi-stage grinding can be configured in the same bay or in two bays. The advantages of two span configuration are simple process and few circuits, but when there are not many grinders, it is more economical to configure in one span
4. The angle of belt conveyor used for grinding machine feeding should not be too large, generally less than 18 °, The receiving point of the feeder should be stable, and the captain depends on the installation requirements of the electronic scale. In order to ensure the accuracy, it is better to use the tail of the heavy hammer to tighten the belt to maintain a certain tension
5. Crane capacity shall be selected according to regulations. When multiple cranes are used e to the large number of mills, the double deck layout method should be avoided to rece the height of the plant
6. The special maintenance equipment should be selected according to the requirements of the manufacturer. The grinding machine with a diameter of more than 5m should generally be equipped with a special manipulator, and there should be enough space and area in the configuration
7. When grinding across the surface, enough slope should be maintained, generally 5-10%, and good sewage and sand discharge systems should be set up to meet the requirements of environmental protection and rece metal loss
8. Due to the large noise in the workshop, the relevant offices, living rooms and automatic control rooms should be arranged far away from the sound source, or appropriate sound insulation measures should be taken
9. The steel ball warehouse should be located near the maintenance site, and the transportation convenience should be considered in combination with the terrain. In order to improve the condition of ball cleaning, a waste ball bin should be set up on the maintenance site to facilitate the transportation of waste balls by truck
10. The area of the maintenance site shall be selected according to the provisions of this manual. The gate of the site shall be consistent with the external transportation conditions. The specifications of the gate shall meet the installation and transportation requirements of grinding machine parts and components. When the overall size of the equipment is large, the installation hole should be reserved
this information is provided by Henan Gongyi Xinxing Machinery Factory.
if not, it is not