Position: Home page » Pool » Mine raking machine manufacturer in Anhui roadway

Mine raking machine manufacturer in Anhui roadway

Publish: 2021-05-25 03:26:46
1. Xiangyang once had more than 30 slag raking machine factories, which closed down last year. Zhongliang and Shuailong are recommended as the two with the highest quality and cost performance.
2. At this time, we need to see if there is a problem with the hydraulic oil. After there is no problem with this part, you need to check whether the oil cylinder leaks oil,. When there is no problem, you try to increase the downforce. If it still doesn't work, it is recommended that the manufacturer send someone to repair it. At this time, I suggest that when you buy slag raking machine, you should choose Xiangyang Zhongliang slag raking machine manufacturer with strong strength and good after-sales service. Don't delay your work because of low price!
3. Introction: Xiangyang Zhongliang Construction Machinery Co., Ltd. (Zhongliang slag raking machine) is an enterprise dedicated to research and development, proction, sales, service and training of mining equipment (slag raking machine, slag raking machine). The company is located in Xiangyang, a famous historical and cultural city with beautiful scenery and pleasant environment
legal representative: Wang Hualiang
time of establishment: November 25, 2005
registered capital: RMB 10 million
Instrial and commercial registration number: 420621000007995
enterprise type: limited liability company (invested or controlled by natural person)
address: No.45 diamond Avenue, Xiangzhou District, Xiangyang City
4. Of course, Zhongliang slag raking machine is the first choice for Xiangyang wheel slag raking machine. Wheel type slag raking machine for shoes, the price is more affordable, is a "good hand".
5.

The suitable cross section of the tyre scraper is 1.6 * 1.6m; 1.8 * 1.8m; 2 * 2m section
suitable section of rail loader: 80 type 1.8 * 1.8m; 100 type 2.5 * 2.5m; 120 type 2.4 * 2.5m; 150 type, 2.5 * 2.8m; 160 Type 3.2 * 3.2m section. The selection of this model is mainly based on the mechanical equipment used to transport ore [such as rail transport, bucket car transport, shuttle car transport, etc.]
suitable section of crawler excavator loader: 80 type 2 * 2.2m; 100 type 2.6 * 2.6m; 100 type 2.2 * 2.4; 120 type 2.3 * 2.6m; 120 type 2.8 * 2.8; 150 type, 2.5 * 2.9m; 150 type 3.5 * 3.5m; 180 type, 2.8 * 3.3m; 180 type, 3 * 4m; 180 type, 4 * 4m; 200 type 4 * 4m; 220 type 4.5 * 4.5m; 260 type 5 * 5m; 312 type, 5 * 5m; 330 type 5 * 5m section
suitable section for inclined shaft with large slope: 80 crawler type 2.4 * 2.5m section with maximum working slope of 30 degrees; The maximum working gradient of 100 crawler type 2.6 * 2.6m section is 25 degrees; 120 crawler type 2.4 * 2.4m, maximum working gradient 28 degrees; 150 crawler type 3.5 * 3.5m, maximum working gradient 28 degrees; The maximum working gradient of 4 * 4m section of 180 crawler type is 32 degrees; 120 crawler type 2.8 * 2.8m, maximum working gradient 32 degrees; The maximum working gradient of 312 crawler type 5 * 5m section is 30 degrees
the main equipment commonly used in the construction of large section or full section are as follows:
rail transportation: gantry drilling jumbo, bolt support, vertical claw or rake bucket rail type rock loader (slag loader), 10 ~ 30 cubic shuttle mine car or mining big bucket car, 12 ton or 25t traction motor car, concrete spraying machine or transport pump, steel formwork jumbo combined supporting construction
trackless transportation: 3-arm or 4-arm tire and crawler electric hydraulic rock drilling jumbo, shotcrete anchor support, anchor jumbo, bucket crawler loader, 20 ~ 25 ton mining truck or pit truck [small secondary wheel and small Dongfeng], concrete spraying machine or delivery pump, integral steel formwork jumbo
the advantages of trackless shipping are high proction efficiency, good mobility, overcoming the practical advantages of working with large slope, small turning radius, strong working force, fast speed, not subject to conditions and so on. Although the initial investment is relatively high, the construction cost is low and fast, the engineering quality is good, and the safety and environmental protection are constantly improving. It is a common construction method in underground construction

6. Chapter 1 Definitions Article 1 the provisions are based on the relevant provisions of proction safety law, mine safety law, regulations on coal mine safety supervision and regulations on coal mine safety. This regulation is applicable to the rail transportation of the transportation roadway, including the rail transportation of the main transportation roadway of the mine, the rail transportation of the transportation roadway between different levels, the rail transportation of the transportation roadway in the mining area, the rail transportation of the two transportation roadways of the working face, and the rail transportation of various temporary transportation roadways< Chapter 2 organization and management article 3 each unit shall establish a "safety responsibility system for leaders in charge of auxiliary transportation" at all levels to clarify the management responsibility, scope and key work
Article 4 each unit shall specify a leader to be responsible for the auxiliary transportation of the whole mine and take the leadership responsibility for the transportation safety of the mine
Article 5 each unit shall have a transport functional management organization with a clear person in charge, who is specially responsible for the auxiliary transport management of the unit and directly responsible for the transport safety of the unit
Article 6 specifies that the full-time transport team leader and a person in charge of the non full-time transport unit shall take direct leadership responsibility for the auxiliary transport safety within the management scope of the unit< Article 7 defines the scope of responsibilities of the transport functional management organization:
1. The mechanical and electrical department is the functional department managed by the transport functional management organization of each unit, which is responsible for organizing and coordinating the design review, comprehensive deployment, installation acceptance, supervision and inspection of the auxiliary transport equipment of each unit, and taking the responsibility of business guidance. The mine safety supervision department is responsible for the inspection and supervision of the auxiliary transportation of the whole mine< Second, adhere to the principle of "who uses, who manages, who bears direct safety responsibility". The person in charge of the relevant business unit is responsible for the management, and the specific leader is mainly responsible
thirdly, according to the actual situation of the mine, formulate the implementation rules of auxiliary transportation management, clarify the responsibilities of all levels, timely find and deal with the problems of auxiliary transportation system, and establish relevant reward and punishment methods< Fourth, the training plan, training, examination and annual review of the Department in charge of training for winch driver, hook operator, signalman, battery truck driver and other key jobs< 5. Be responsible for the inspection, recording and assessment of whether the winch driver, Hooker, signalman and battery truck driver are qualified before the shift and whether they work in compliance with regulations ring the shift< Sixth, check the track, turnout quality, equipment and facilities, good condition of mining vehicles, measures
fulfillment, operation in compliance with regulations, site environment and system establishment of the auxiliary transportation line of the whole mine, deal with the problems found in time, and rectify within a time limit
VII. Organize the acceptance of transportation roadway facilities and hoisting winch before operation< 8. Be responsible for the selection, design and installation of anti sports car and anti sports car protection device in transportation lane. Responsible for the preparation and summary of annual, quarterly and monthly work plans of mine auxiliary transportation. All units applying for the use of dispatching, double speed and column return winches must calculate according to the slope, transportation distance, maximum lifting load, traction mode and other data of the construction roadway, correctly select the winch model and steel wire rope, and then assemble and install the winch, sound and light signal, electrical small parts and cables after being reviewed and approved by the mine mechanical and electrical department< Chapter III General Provisions Article 8 special measures must be formulated to transport four super (super long, super wide, super high and overweight) vehicles
Article 9 any transportation unit using transportation lane dispatching, double speed and return winch must fill in the following records: inspection,
overhaul and maintenance records. Inspection and replacement record of steel wire rope. Electrical and mechanical fault records
Article 10 any transportation unit that uses transportation lane dispatching, double speed and return winch must formulate the following system: post responsibility system for the driver, hook operator and signal operator. Operation proceres for driver, coupler and signalman. Driver, hook operator and signal
shift system. Patrol inspection, maintenance and repair system
Article 11 "three good, four have, three implement" and "three fixed, four insurance" must be achieved for small winch transportation
three good: the winch equipment is in good condition, the roadway specification and support are good, and the track quality is good
four have: reliable anti sports car and sports car protection device, rope roller, signal and refuge chamber, sound and light signal
three implementation: implementation of post responsibility system, implementation of inspection and maintenance responsibility, and implementation of shift handover system. Three fixed: fixed driver, fixed signal worker, fixed hook worker
four insurances: safety gate, safety rope, safety pin and safety chamber
Article 12 the driver of small winch must be "six don't open". That is to say, if the winch is not in good condition, if the wire rope is knotted or broken, if the wire is worn beyond the limit, if the safety facilities and signal facilities are not complete, if the super trailer is not opened, if the signal is not clear, if the "four super" vehicles are not opened without transportation measures
Article 13 the hook workers must be "six not linked". That is: if the safety facilities are not complete and reliable, if the signal is not connected properly, if the "four super" vehicles are not connected without transportation measures, if the heavy vehicle loading is not standard, if the connecting device is not qualified, if there are pedestrians in the transportation lane. Before sending the signal, the hook head, bolt, three link chain, steel wire rope, vehicle connection and safety rope must be checked comprehensively. After confirming that the connection is normal and the winch has no remaining rope, the signal can be sent to start
Article 14 the signalman must achieve "five don't send out": there are pedestrians on winch road don't send out; The Super Trailer will not be launched; No delivery without the consent of the hook operator; If the loading does not meet the requirements, it will not be delivered; No hair without a safety rope
Article 15 when the winch is in operation, the transportation lane must implement the system of "no driving, no pedestrians, no driving". It is forbidden to push the hook in the transportation lane. When the personnel need to be transported up and down the line by the small winch, it must be allowed by the hooker. The signalman sends the signal to inform the driver. After the personnel pass, they must return to the signal before they can work. When the red light is on, it is strictly forbidden to get on and off
Article 16 it is strictly forbidden to push the hook in auxiliary transportation, and pedestrians are strictly prohibited when driving. When personnel go up and down, they can only go up and down with the consent of the hook operator and send a stop signal, and the winch stops running; The sound and light alarm device linked with winch must be installed at the loading and unloading yard of transportation lane and each mping crossing
Article 17 it is forbidden to rest and work in the winch chamber when the winch is running the hook. When working in the transportation lane, safety measures must be prepared, submitted to the relevant leaders for approval, and can only work after contacting with the relevant personnel
Article 18 when transporting the "four super" vehicles in the transportation lane, they must be tied firmly, lifted and transported separately, the center of gravity is not biased, and they must be connected with special multi link connectors. If other items are used instead, measures must be taken and approved by the leader in charge
Article 19 special binding measures must be formulated for large-scale materials, and special personnel shall be responsible for it. Large equipment into the well must be fixed with anchor bolts, and the upper and lower ends are protected by protective chains
Article 20 each mine must establish a management account for the transport lane and register the technical parameters of the transport lane equipment and facilities; The calculation basis and process of the selected equipment and facilities; The equipment and facilities are in good condition, and the charter party is responsible for it; Management unit changes and inspection problems. Record the original design and construction of equipment and facilities
Chapter IV transportation roadway, yard and chamber
Article 21 winch chamber, each yard, swing lane and chamber must be designed, and its roadway section, sidewalk width, safety distance between equipment and facilities and vehicles, safety distance between double track yard, etc. must comply with the provisions of Article 21, 22 and 23 of "coal mine safety regulations". Refuge adits must be set up at the car yard and each crossing in the transportation lane< Article 22 specific requirements for each depot:
I. the length of each depot in the small transportation lane of mining and transportation is 1.5 times of the length of one lifting train
2. The length of each yard in the main transportation lane is more than 3 times of the length of one-time lifting train
3. No negative slope shall be formed in the car park to prevent the vehicles from sliding down< The width of the yard meets the requirements of Article 23 of the coal mine safety regulations
Article 23 the number of hoisting cars for inclined roadway dispatching and return winch transportation must meet the following requirements: single rope winding hoisting winch, the number of hoisting cars must be calculated and marked on the site management board. The number of lifting cars must be calculated and marked on the site management plate. Qualified chains should be used to connect the cars. Transportation without connection between vehicles is strictly prohibited
Article 24 the track radius of the middle and lower yards of the transportation lane must be designed to meet the needs of installing standard turnouts
Article 25 the winch and equipment chamber must be excavated for the construction of the reverse drawworks and the opposite drawworks in the haulage lane
Article 26 the front of the back-up winch must be supported with body protection pillars (no less than 2) or stone stacks
Article 27 when there are rail and belt or chute transportation in the same roadway, the safety distance between them must comply with the provisions of Article 22 of "coal mine safety regulations". The driver's operating room must be excavated at the head of the chute and belt conveyor, and it is forbidden to operate the chute and belt on the rail side
Article 28 the main transportation lane must be designed and constructed with regular ditch, complete cover plate, and the running water shall not scour the road center
Article 29 the chamber of small winch shall meet the design requirements, and the distance between the most prominent part of winch and one side of roadway or shed shall not be less than the specified distance. The chamber support is qualified
Article 30 the drum center of lifting winch shall coincide with the track center line, and the lateral arrangement can be adopted in the near horizontal machine lane and air lane. The angle between the drum center line of the winch and the track center line shall be appropriate, so as to make the wire ropes arranged orderly, installed firmly and operated conveniently. No rope biting, rope climbing, rope skipping and orderly arrangement. The tail rope head of the steel wire rope must be pressed on the winch drum, the rope pressing plate shall not be less than two pairs, and the rope head shall not grind the winch motor end cover screw
Article 31 the backhauling winch for driving uphill construction shall be installed on the outside of the track, and the flat guide wheel shall be installed at the head, and its diameter selection shall comply with the provisions of article 416 of "coal mine safety regulations", and it is forbidden to replace it with small sliding plate. The fixing method of the guide wheel shall be clearly specified in the construction measures, all of which shall be exposed to facilitate inspection, and the person in charge of the inspection shall be assigned. The fixing of the guide wheel of the backward drawworks must be designed
Chapter V installation of dispatching, double speed and return winch
Article 32 the installation of dispatching, double speed and return winch must meet the following standards:
1. When using jd-25 and above winch, it must be fixed with concrete foundation or ground anchor. The foundation design shall meet the design requirements of winch manufacturer, and the foundation size and anchor screw shall be constructed according to the specification
2. The installation of jd-11.4 small winch should be determined according to the lithology of roadway floor:
(1) for the roadway with hard sandstone floor, the winch can be fixed by bolting
(2) for the roadway with medium hard sandy shale floor, the method of bolting can also be used to fix the winch, but the ground anchor can only be used after the anchoring force test
(3) for long-term permanent winch and roadway with soft rock and coal floor, concrete foundation can be used to fix the winch
(4) the column pressing winch can only be used when it moves along with the advancing of the mining face, and its number should be increased
7.

1 There are two operating handles on the console. The front and back direction of the right handle controls the forward and backward movement of the trolley, and the left and right direction controls the up and down tilting movement of the slag raking arm. The front and back direction of the left handle controls the pulling down and lifting of the slag raking plate, and the left and right direction controls the left and right swing of the frame. The proportional valve is pushed forward and backward by the right handle, which can control the running speed of the car according to the pushing angle. The larger the pushing angle is, the faster the speed is; The other directions of the two handles push and control the reversing valve, which can only change direction but not speed. The speed adjustment is pre adjusted by the throttle valve in the hydraulic system
(2) there is a limit switch at the front end of the rack, and the car will stop automatically when the switch is knocked down. Due to the different movement speed of the operating trolley, the inertia effect will make the trolley stop at different distances. The front travel switch position is generally set after the medium speed impact to stop the trolley without hitting the buffer. In actual operation, e to the limitation of ladle position, the trolley does not need to go to the front limit position. There are two limit switches at the rear end of the rack. The front one is a deceleration switch. After knocking it down, it will output a signal to control the car to decelerate. When the car hits the rear limit switch, it will stop quickly
(3) a limit switch is set for the left and right swing of the rack, and one controls the maximum working angle of 10 °, The other controls the maximum turning angle of the maintenance station 45 °, The corner of the maintenance station can be set according to the actual needs of the workplace< (4) the distance between the tilting of the slag removing arm and the driving of the slag removing plate is limited by the maximum stroke of the hydraulic cylinder
(5) on the adjusting screw joint of the trolley Ф Pin 10 is a safety pin. In case of abnormal situation, the pin will be cut off to protect the hydraulic motor, chain and other parts when the force on the transmission system exceeds 2-3 times of the designed slag removal force. If the safety pin is cut off, it is necessary to analyze the cause of the accident and formulate solutions before the structure can be restored
(6) the hydraulic system of the driving system of the slag scraper has the function of overload protection, and the system pressure shall not exceed the design pressure when in use
(7) the travel switch of the trolley can be set to meet the slag removal travel, so the trolley can not often impact the spring buffer device

Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750