Position: Home page » Pool » How about Pingmei Group Henan mining machinery Co, Ltd

How about Pingmei Group Henan mining machinery Co, Ltd

Publish: 2021-05-24 03:16:47
1. Pingdingshan mining area of Pingdingshan Coal Instry Group Co., Ltd. was listed as a major construction project of the first five year plan in 1952 and one of the ten mining area construction projects in 1953. It is the first large mining area developed and constructed in New China. In April 1954, the Preparatory Office of Pingdingshan coal mine was established. In September 1955, the construction of the second mine of the first pair of mines in Pingdingshan was started. In 1957, Pingdingshan Mining Bureau of Henan Province was established. In February 1985, Pingdingshan Mining Bureau was under the direct leadership of the Ministry of coal instry. In January 1996, it was transformed into a state-owned limited liability company. In September 1998, Pingdingshan Coal Group Company was transferred to Henan Province for management, In December 2002, it was restructured into a limited company with multiple investors
marked by the start of construction of No.2 Coal Mine in September 1955, Pingdingshan mining area entered the period of comprehensive development and construction. By the end of 1958, 11 pairs of mines had started construction. By 1960, the raw coal output of Pingdingshan Mining Bureau exceeded 5 million tons, which played a very important role in easing the shortage of coal supply in the country. In 1975, "double ten million" was realized, that is, the annual output exceeded 10 million tons, the profit exceeded 10 million yuan, and it entered the overall situation of 10 million tons in China. In 1996, the coal output exceeded 20 million tons, and it became a super large coal enterprise with important influence in China
in 2003, the output of raw coal reached 26.69 million tons. At present, there are 14 proction mines; There are three coal preparation plants, with an annual clean coal output of 5 million tons. The total assets are 11.47 billion yuan, the annual sales revenue is 7.6 billion yuan, and there are 127000 employees. It has successively won the honor of national contract abiding and trustworthy enterprise, quality trustworthy unit of coal instry, national "May 1st" labor award and so on. It ranked 222nd among the top 500 Chinese enterprises in 2003. The enterprise has set up a national technical center, a national mine rescue center and a national A-level labor safety and health evaluation and consultation center
with the development strategy of "focusing on coal and related diversification", Pingdingshan Coal Group will take a new instrial road to build a super large energy enterprise with outstanding main coal instry, strong core competitiveness, strong sustainable development ability and integration of coal electricity and chemical instry, which has an important influence in China, and become an important thermal power base, coal chemical base and metallurgical coal base in China, Enter the top 100 enterprises in China
the three-step development strategic objectives of Pingdingshan Coal Group are as follows: the first step is to achieve 30 million tons of raw coal, 6 million tons of clean coal and 9 billion yuan of sales revenue by 2005; Second, by 2010, the output of raw coal will be more than 50 million tons, the clean coal will be 15 million tons, and the sales revenue will be 15 billion yuan; The third step is to proce 100 million tons of raw coal by 2020
Pingdingshan Coal Group has extensive development space and great potential. Through the signed cooperation agreement, the area of coal field is 3000 square kilometers, and the coal reserves are 15 billion tons, which provides sufficient strategic resources for the rapid development of the enterprise. With complete coal types and abundant resources of coking coal, power coal, lean coal and anthracite, especially the scarce coking coal resources in China, it is an important coking coal base in China. It is one of the 13 large-scale coal bases planned and constructed by the state and one of the top ten coal transportation channels proposed by the Ministry of railways
now it is renamed Zhongping energy chemical group
2. The treatment of the central hospital is very good, but I feel that it's relatively dark, and it's difficult to enter the graate school
3. Check the phone number of the hospital and talk about it directly.
but it's hard to find a job now. It's still a good thing to be stable in Suizhou.
it's said that the treatment of the central hospital should not be bad. It's OK. I don't know very well.
what can I do for you? I'll help you find
the underworld. In fact, it's the Central Hospital in Suizhou with more money and higher expenses. As long as you have money, it's OK for you to take care of it. It doesn't matter that you rely on your ability.
no matter what, there will always be a shortage of people. It's better to try than not, don't you think```
4.

The south bus station is near. At the south bus station, take Hangzhou Metro Line 1 to Wujiang Road station, and at the passenger transport center, take Hangzhou Metro Line 1 to the passenger transport center station

5. Here are five bus routes for your reference: scheme 1 [transfer once]: k192 → 10 / K10
start from north bus station, take No. k192 or No. 1 of branch B or k188, take 4 stops and get off at shentangqiao bus station, transfer to No. 10 / K10 or No. 1 / K1, take 2 stops and get off at fengqilu bus station
scheme 2 [transfer once]: k192 → 26 / k26
start from north bus station, Take bus k192 or k516, take bus 8, then get off at Wulin small square station, transfer to bus 26 / k26, take bus 2, then get off at bus Fengqi Road Station
option 3 [transfer once]: k76 → 1 / K1
start from bus north station, take bus k76, take bus 5, get off at bus changzhengqiao station, and transfer to bus 1 / K1, Take 8 stops and get off at Fengqi road bus station
option 4 [transfer once]: k516 → 355 / K355
start from north bus station, take k516, take 12 stops and get off at bus City Gymnasium station, walk to Bus City Gymnasium station across the street and transfer to 355 / K355, Take 2 stops and get off at Fengqi Road Station of bus
option 5 [transfer once]: K91 → 10 / K10
start from north bus station, take K91, take 5 stops and get off at Meiyuan intersection of Pingshui West Road, walk to Meiyuan intersection of Pingshui West Road, transfer to 10 / K10, take 14 stops and get off at Fengqi Road Station of bus
6.

bus line: Metro Line 1 → Metro Line 2, the whole journey is about 25.3km

1. Walk about 250m from Hangzhou bus passenger transport center station to the passenger transport center station

2. Take Metro Line 1, pass 10 stops, reach Fengqi Road Station

3. Walk about 250m, transfer to Metro Line 2

4. Take Metro Line 2, pass 8 stops, reach xialongwei station

5 Walk about 570 meters to the vehicle management office of Hangzhou traffic police detachment

7. Bus route: No.14, the whole journey is about 6.8km
1. Take No.14 from south bus station, pass 9 stops,
arrive at Guanqiao station
2. Walk about 340m to Sanhua garden
Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750