Panjin dressing machine
at present, India bit is a rare brand maintenance team in the instry, and it is an official quality maintenance team. At present, it has won the official authorization of Shenma and Xindong for maintenance, and Shenma mining machinery is free of charge for maintenance. Its team repaired ant mining machinery in the early stage, and has five years of maintenance experience, so there is no problem with its business ability. There are maintenance centers in Zhundong, Xinjiang, Cheng, Sichuan, Dehong, Yunnan and Shenzhen, Guangdong. Now they are still actively building maintenance centers, covering more than half of the mining areas in China
in addition, the official website supports online order repair, which is the first repair website in the instry with transparent price and complete repairable models, which has a positive role in promoting the whole repair instry and standardizing the repair process and quotation. At the same time, backed by the coin printing pool (brother company), there will be no cheating or non recognition. Like the coin printing, the service level in the instry is top-notch. You can go to the official website to experience the specific situation.
at the same time, Shenma M20 / M21 series and p21 power supply quick repair can also realize quick repair with quality assurance because they are authorized maintenance brands of Shenma and Xindong.
There is a flat head screw at the bottom of carburetor, which can be unscrewed
carburetor is a key part of engine, small changes may affect vehicle performance. Therefore, in the process of carburetor disassembly, appropriate tools should be used, and the force should be moderate, so as to prevent the deformation of parts. The disassembled parts should be placed in order in order to prevent missing or wrong assembly
in the process of cleaning the carburetor, if more deposits are found in the float chamber of the carburetor, it is often caused by the failure of the gasoline filter. At this time, the gasoline filter should be checked. If the failure is confirmed, the gasoline filter should be cleaned or replaced
extended information:
precautions:
1. Carburetor is a key part of engine, small changes may affect the vehicle performance. Therefore, in the process of carburetor disassembly, appropriate tools should be used, and the force should be moderate, so as to prevent parts from deformation. The disassembled parts should be placed in order in order to prevent missing or wrong assembly
2. The carburetor should be cleaned in a clean place, the outer surface of the carburetor should be cleaned, and the internal parts can be cleaned with special cleaning agent for carburetor or instrial gasoline. In addition to impurities, pay attention to clean the gasoline gum on the surface of parts
3. Clean the cleaned parts with compressed air, and do not wipe them with cloth or paper that may cause burr to prevent re pollution. It is forbidden to poke the blocked small hole with steel wire and other hard objects to prevent the change of carburetor performance caused by changing the aperture. Gasoline or compressed air should be used to wash out
before the installation of the disc feeder, it is necessary to check the foundation position and geometric size according to the parameter table, and make sure there is no error before the installation. The oil, gravel, soil and water on the surface of the equipment foundation and in the reserved hole of the anchor bolt shall be removed. The thread and nut of the embedded anchor bolt shall be protected, and the surface of the place where the pad iron is placed shall be chiseled flat. Make corresponding records after unpacking inspection and acceptance of equipment parts. The installation shall be carried out according to the proct manual. During the installation, the position shall be found according to the center of the silo, and the deviation of the center distance shall not exceed 5mm; The disc must be in a horizontal position with a deviation of not more than 0.5/1000. Then, the channel steel column is fixed at the lower part of the silo, and the feeding pipe is connected with the screw brake; Turn the V-belt by hand to check whether it operates flexibly; Check the lubricating height in the turbine recer and inject proper amount of lubricating oil into the lubricating points
before the disc feeder equipment is put into proction, the necessary training should be given to the operators to make them master the correct operation process. Only in this way can the service life of the equipment be prolonged and the proction capacity of the equipment be improved. So what is the specific operation process
1. Employees can only operate the equipment after wearing relevant protective equipment It is very necessary, many accidents are e to the lack of protection for personnel)
2. Before starting the machine, check whether the disc is in the horizontal position, and use hand turning to check the operation flexibility
3. Add lubricating oil before starting. At this time, check the rotation direction of the disc to make sure that the motor wiring is correct
4. Check for periodic noise and oil leakage
5. Check the temperature rise of bearing and lubricating oil to make sure it is within the normal range
6. Check the position of scraper and movable sleeve before operation
7. During operation, the spiral gate should be opened after the disc transmission is stable, and the spiral gate should be closed before stopping
8. Always check the lubrication, bearing operation and temperature rise of each part. If there is overheating, it should be eliminated immediately. If necessary, it should be stopped for treatment
9. During long-term operation, the wear of scraper, movable sleeve, disc worm gear, worm, V-belt and seal should be inspected regularly for timely adjustment, maintenance or replacement. Adjustment, repair and other operations are not allowed when the equipment is in operation
10. Clean the equipment and the surrounding area before each shift
lubrication of disc feeder
firstly, thin oil splash lubrication should be used for disc feeder, and the lubricating oil should be determined comprehensively according to the place of use and air temperature conditions, generally gear oil can be used
secondly, ensure that the oil level in the exciter is higher than the oil level (it can be filled through the joint and elbow), and replace it every 3 to 6 months. Pay attention to clean gasoline or kerosene to clean the oil tank, bearing raceway and gear surface when changing the oil
in addition, other vulnerable and easily worn parts should be cleaned and lubricated in time to prevent the wear from affecting the work of the equipment and rece the proction cost.