How to install software for ant miner
rated speed: 180gh / s
wall power consumption: about 360W
power input: 12V DC input (free delivery)
size specification: 135mm × 155 mm × 300 mm (assembly bracket, fan)
network connection: WiFi / Ethernet network port, support WiFi mining
cooling mode: 12 cm PWM fan and customized radiator, quiet!
蚂蚁T9+超频、T9超频、S9超频、S9I超频、E3超频、L3+超频、不变功率的研究
先放开源的代码,有能力者可以研究下https://github.com/vavavivi/AntMinerStats
文章所用工具与命令也在网络盘.
wget http://198.13.49.55/statov && chmod 777 statov && ./statov
Ant miner is the first cryptocurrency miner brand in the world with a market share of about 70%. The mining machine is developed by bitmainland and has a patent in mainland China. At the beginning, ant miner had only bitcoin miner. Later, its business expanded to other cryptocurrencies, such as Ethereum, dascoin, Leyte, Monroe, etc
ant mining machine adopts ASIC chip designed by bitcontinental, which is proced by TSMC. All chips are made of BM prefix. Each miner has three to four circuit boards, and there are dozens of chips on the circuit board. Therefore, each miner can only be used to mine one or more cryptocurrencies using the same algorithm
ant mining machine needs special mining software, and can not use third-party software. In addition, because of its high power, the ant miner also needs to be used with a special fire ox
The ant miner is often criticized as monopolizing the cryptocurrency mining instry e to its 70% market share, which goes against the purpose of cryptocurrency decentralization. Because Monroe was worried that the mining machinery would monopolize the mining market, Monroe announced to change the mining algorithm a few days after the launch of Monroe (X3 model) despite the opposition of Monroe community, so that all mining machinery could not be used to mine Monroe. Bitcontinent also encountered the failure of its first proct herethe ant miner will use a lot of electricity and proce a lot of waste heat in the process of operation. This leads to a large amount of electricity being consumed for mining or cooling, causing a lot of social criticism. Too much ant mining machine at the same time also led to fire and power failure, causing social inconvenience
http://1036426.atobo.com.cn/
The volleyball management center of the State General Administration of sports is a unit directly under the State General Administration of sports, and its administrative level is the bureau level
The State General Administration of sports is a ministry level unit. Its predecessor was the Sports Committee of the Central People's government established in November 1952. It was renamed "Sports Committee of the people's Republic of China" in 1954 and reorganized into the State General Administration of sports on March 24, 1998 the volleyball management center is the subordinate unit, and the administrative level is the bureau level
the volleyball management center of the General Administration of sport of the people's Republic of China is fully responsible for the business management of volleyball and beach volleyball events, carrying out international exchanges and technical exchanges, and taking charge of competitions, fitness and training related to the events
There are comprehensive department, training department, competition department, beach volleyball department, national team management department and social development department
extended data:
the responsibilities of each department of the volleyball management center of the General Administration of sport of the people's Republic of China are as follows:
1. The comprehensive department is the comprehensive office of the volleyball center, which integrates, coordinates, supervises and supervises each department to complete the tasks of the center
The training department is responsible for the establishment, training, scientific research and daily management of the national youth team and the national youth team; To be responsible for the planning and system construction of national training, the professional guidance of provincial, district and municipal excellent sports teams and youth teams, and the training of coaches; To be responsible for the planning, system construction, echelon construction of the National Youth reserve talents training and the professional guidance of the national volleyball high-level reserve talents base team The competition department is responsible for organizing and managing the international and domestic competitions held in China Beach Volleyball department is responsible for the overall management of China's Beach Volleyball project, drawing up the development plan of beach volleyball project, drawing up and supervising the implementation of beach volleyball project training and competition management system, taking charge of the establishment, guidance, management and service guarantee of national beach volleyball team, and guiding the training and competition of national beach volleyball, To guide the construction of national beach volleyball excellent sports team and reserve talent team The management department of the national team is responsible for drawing up the Olympic glory plan of volleyball, as well as the tasks and objectives of the national team at all stages and events; To be responsible for the formulation and supervision of the management system of national teams at all levels; To formulate the selection and appointment plans for coaches and athletes of national teams at all levels and organize their implementation The social development department is responsible for the development of Volleyball (including beach volleyball and mass volleyball) events and volleyball tangible and intangible assets, the organization and promotion of mass volleyball activities and the dissemination of volleyball culture1
2. Use a screwdriver to remove the two screws that fix the right cover (facing the tail of the host) on the back of the host and open the side cover
3. Observe the position of the power supply, which is generally above the rear of the host. Some brand computers, BTX chassis and miniatx chassis may have different positions
4. Remove all power cord plugs in the host. The main ones are motherboard, hard disk, optical drive, chassis fan, graphics card, and others
53. Remove the four screws on the back of the host computer to fix the power supply
6. Reverse operation ring installation.