Position: Home page » Pool » Difference between N1 miner and S9 miner

Difference between N1 miner and S9 miner

Publish: 2021-05-16 03:55:56
1. At the beginning of 2017, the price of a 14.5t S9 mining machine was as high as 20000 yuan. Take the current market situation, the cost of investment and mining is very low. Moreover, according to the current issue price of HRT, the cost of the same computing power is only about one tenth, which is about more than 2000 yuan.
2.

About 96 yuan

3.

Ant mining machine S9 how much a day to dig

S9 computing power 13.5T, the current network computing power 6.39eh/s, 1e = 1024p, 1p = 1024t, 1t = 1024g, a S9 a day to proce bitcoin is [13.5 / (6.39 * 1024 * 1024)] * 180 ≈ 0.0036btc< br />

4.

I can't find one in a day. Now bitcoin is not what it used to be. If you think the answer has solved your problem, please adopt it. If you have any questions, please continue to ask. I hope my answer can help you. One machine a day is about 0.03, 40 machines a month is 0.03 * 40 * 30 = 36, of course, 40 mining machines also need 400000, which is not included in the electricity bill. According to the current difficulty calculation, about 0.01584 bitcoins can be g in a day. Of course, the final result of each mine is different, but it will be very close to one day. Now bitcoin is not what it used to be. Moreover, bitcoin is now banned by more and more countries. Bitcoin can't be traded in the mainland today. Now the price of ant S9 has gone up to the sky. It's eighteen thousand. It's not recommended to buy in stock. It's too long to go back to this cycle. You can consider other options

1. If all the wires have been connected, we can turn on a connected PC at this time and turn on the network neighborhood property

2. Open the local connection attribute; 3 and then open the TCP / IP protocol properties

5. What are you doing here? If you dig bitcoin, choose ant S9
6. It is
CPU – GPU – FPGA – ASIC – mine pool. This is the development history of mining machinery instry
I hope I can help you!
7. There is a big difference. In the previous S7, the computing power was only more than 4T, and the power consumption was 1042W
S9 was upgraded to 14T, and the power consumption was only 1400W, which saved too much power
8. According to the current total computing power and the current growth rate of total computing power, it will take about 250 days to dig a bitcoin
9.

The revenue of 24 hours per T is equal to 0.00021011btc, and that of an ant S9 14T is equal to 0.00294154btc.

the current price is 37500 yuan, and the daily revenue is about 110 yuan.

ant S9 consumes 34 degrees of electricity per day (with 5% error), and the electricity fee is 0.4 yuan per degree, and the electricity cost is 13.6 yuan per day, The daily profit of an ant S9 14T miner is about 110-14 = 96 yuan

10. The benefits are the same
Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750