Where does Anhui new type pick up machine have
(1) strictly implement the relevant provisions of "coal mine safety regulations", "operation regulations" and "operation regulations", abide by the national laws and regulations on safe proction and various rules and regulations, work with valid certificates, make good use of labor protection equipment, do not work against rules, and complete various proction tasks as required, Take direct responsibility for the safety proction of the post
(2) pay attention to the operation of the slag scraper at any time ring its operation, do not make the slag scraper operate with diseases, timely and correctly analyze, judge and deal with problems, so as to nip the accident in the bud. If it can't be handled, it should immediately report to the leader truthfully, and cooperate with the relevant personnel to analyze the cause of the fault and remove the difficult fault without delay
(3) in the work, we should concentrate on the correct and careful operation of the slag scraper, pay attention to the changes of the coal seam and roof and floor, and stop the machine immediately in case of roof fall and rib spalling, so as to assist the support worker to deal with it in time
(4) ring the operation, inspection, maintenance and troubleshooting of slag raking machine, it is necessary to pay attention to relevant safety matters to ensure work safety
(5) under no circumstances should the slag scraper be operated by personnel without a license. When the slag scraper needs to stop working or replace the digging teeth or overhaul, it must be shut down according to the safety requirements
(6) in the work, we should refuse the instruction of illegal operation, and dissuade and stop others' illegal operation
(7) to actively participate in various safety activities, post technical training, improve safety awareness and skills, report accidents in time, and protect the scene
(8) have the knowledge of coal mine disaster prevention and self rescue, mutual rescue and on-site first aid, take safety and first aid measures immediately in case of accident, actively carry out self rescue and mutual rescue, prevent the situation from expanding, protect the scene, and report to the superior immediately
(9) strictly implement the on-site shift handover system. In addition to carefully filling in the operation log and accident records, the operation of the unit equipment in this shift should be told to the next shift driver in detail, so as to pay attention to the next shift processing and operation.
The suitable cross section of the tyre scraper is 1.6 * 1.6m; 1.8 * 1.8m; 2 * 2m section
suitable section of rail loader: 80 type 1.8 * 1.8m; 100 type 2.5 * 2.5m; 120 type 2.4 * 2.5m; 150 type, 2.5 * 2.8m; 160 Type 3.2 * 3.2m section. The selection of this model is mainly based on the mechanical equipment used to transport ore [such as rail transport, bucket car transport, shuttle car transport, etc.]
suitable section of crawler excavator loader: 80 type 2 * 2.2m; 100 type 2.6 * 2.6m; 100 type 2.2 * 2.4; 120 type 2.3 * 2.6m; 120 type 2.8 * 2.8; 150 type, 2.5 * 2.9m; 150 type 3.5 * 3.5m; 180 type, 2.8 * 3.3m; 180 type, 3 * 4m; 180 type, 4 * 4m; 200 type 4 * 4m; 220 type 4.5 * 4.5m; 260 type 5 * 5m; 312 type, 5 * 5m; 330 type 5 * 5m section
suitable section for inclined shaft with large slope: 80 crawler type 2.4 * 2.5m section with maximum working slope of 30 degrees; The maximum working gradient of 100 crawler type 2.6 * 2.6m section is 25 degrees; 120 crawler type 2.4 * 2.4m, maximum working gradient 28 degrees; 150 crawler type 3.5 * 3.5m, maximum working gradient 28 degrees; The maximum working gradient of 4 * 4m section of 180 crawler type is 32 degrees; 120 crawler type 2.8 * 2.8m, maximum working gradient 32 degrees; The maximum working gradient of 312 crawler type 5 * 5m section is 30 degrees
the main equipment commonly used in the construction of large section or full section are as follows:
rail transportation: gantry drilling jumbo, bolt support, vertical claw or rake bucket rail type rock loader (slag loader), 10 ~ 30 cubic shuttle mine car or mining big bucket car, 12 ton or 25t traction motor car, concrete spraying machine or transport pump, steel formwork jumbo combined supporting construction
trackless transportation: 3-arm or 4-arm tire and crawler electric hydraulic rock drilling jumbo, shotcrete anchor support, anchor jumbo, bucket crawler loader, 20 ~ 25 ton mining truck or pit truck [small secondary wheel and small Dongfeng], concrete spraying machine or delivery pump, integral steel formwork jumbo
the advantages of trackless shipping are high proction efficiency, good mobility, overcoming the practical advantages of working with large slope, small turning radius, strong working force, fast speed, not subject to conditions and so on. Although the initial investment is relatively high, the construction cost is low and fast, the engineering quality is good, and the safety and environmental protection are constantly improving. It is a common construction method in underground construction
all the top-level equipment in the game are basically proced in each , and the boss in each has his own unique skills, so players must face up to them before they can get the reward.
legal representative: Wu Zhiming
time of establishment: July 8, 2011
registered capital: RMB 10 million
Instrial and commercial registration number: 420112000106676
enterprise type: limited liability company (invested or controlled by natural person)
address: 302 (13), 3 / F standard instrial building, building A32, No.96 Xifu Road, Zoumaling Street office, Dongxihu District, Wuhan City