How to get to Canglang neighborhood center by subway
1. Walk about 10 meters from Hangzhou east station to east railway station
2. Take Metro Line 4, pass 6 stations and reach the citizen center station
the maximum daily and hourly water consumption is calculated as follows
building name unit maximum daily domestic water quota (L) service hours (H) hourly variation coefficient K H
daily domestic water supply of shopping mall staff and customers per m2 of business hall area is 5-8121.5-1.2
building The design second flow of water should be calculated as follows:
QG = 0.2 α Sqrt (NG)
where: QG -- design flow per second (L / s) of feed water of calculated pipe section
ng -- the total water supply equivalent of sanitary ware in pipe section is calculated< br /> α — — The coefficient determined according to the use of buildings should be adopted according to table 3.6.5 (1.5 for shopping malls)
note: 1. If the calculated value is less than the maximum rated water supply flow of sanitary ware on the pipe section, the maximum rated water supply flow of sanitary ware shall be used as the design flow per second
2 if the calculated value is greater than the flow value accumulated according to the rated water supply flow of sanitary ware on the pipe section, the flow value accumulated according to the rated water supply flow of sanitary ware shall be adopted
3 for the water supply pipe section with toilet delay self closing flushing valve, the water supply equivalent of toilet delay self closing flushing valve is calculated as 0.5, and the calculated QG is the designed second water supply flow of the pipe section after adding 1.20l/s flow
4 comprehensive building α The value should be calculated by weighted average method
the fire water consumption should be obtained according to the code for fire protection design of buildings (GB 50016-2006) or code for fire protection design of high rise civil buildings (GB 50045-95) (2005 Edition) and the building scale.
The nearest is Xinghai Square Station: the intersection of Suhua road and Xinghai street. It's about 800 meters apart. It's not far
take bus No.26 in the neighborhood center of the new city to the city garden (about 1 station of the rail transit Xinghai Square Station)
= the price of the keyboard with static capacitance is relatively high, but it's better to use the machine in E-sports
at present, professional players also use mechanical keyboards, while static capacitance keyboards hold a wait-and-see attitude.
The nearest driving distance from Wenzhou bus passenger transport center station to Longwan airport is 24 km. It costs about 78 yuan to take a taxi. It takes about 40 minutes to get there
bus line: No.88 → No.73, the whole journey is about 23.5km
1. Take No.88 from Wenzhou passenger transport center, pass 6 stops, and then arrive at dabudi station
2. Take No.73, pass 28 stops, and then arrive at Wenzhou airport station
Wenzhou Longwan airport to Wenzhou EMU Station - Wenzhou south station, you can take bus No. 73 to Wenzhou south station, the ticket price is 5 yuan
you can also take the airport express bus from Wenzhou Longwan airport to Wenzhou south station. The fare is 12 yuan, about one hour
a taxi costs about 100 yuan. About 30 minutes without traffic jams
{rrrrrrr}
extended data
Wenzhou south railway station is located in Ouhai District, Wenzhou City, Zhejiang Province. It is the terminal station of Ningbo Taizhou Wenzhou Railway, xinjinwen railway and the starting station of Wenzhou Fuzhou railway. The stopping times are all EMUs / high-speed trains. It is under the jurisdiction of Ningbo train depot of China Railway Shanghai Bureau Group Co., Ltd. and is now a first-class station. Wenzhou South Railway Station was opened on September 28, 2009
the total land area of Wenzhou south railway station is 190368 square meters, including 71209 square meters. According to the planning of new Hangzhou Wenzhou high speed railway, the new sub station building on the opposite side of Wenzhou South Railway Station will be designed as 15000 square meters temporarily
based on the existing 4 sets of 10 arrival departure tracks, 4 arrival departure tracks and 2 Island platforms are added; The newly-built Wenzhou South EMU operation station has 8 inspection depots and 32 storage lines in the near future, 4 inspection depots and 14 storage lines in the long term
when passengers take rail transit line S1 to Wenzhou south station, they can realize seamless transfer of high-speed rail, rail transit, bus, BRT, long-distance bus, taxi, airport bus and other transportation modes. Wenzhou South Railway Station will spare no effort to build a national comprehensive transportation hub and become a railway hub in East China
on June 5, 2018, Wenzhou South Railway Station added Internet ordering service
reference: Wenzhou South Railway Station Network