Is qubu decentralized
Fun step is an app step counting software with the concept of sports health, not a hoax
the candy proced by qubu blockchain is not the candy we ate when we were young. In fact, this "candy" can be exchanged for money. And fun step chain can proce candy and make money for itself by walking. Some people ask if qubu is deceiving? This does not need to pay membership fees, you do not need to invest, so it will not cheat you
in any case, before qubu develops, it will be questioned by many people, so if you believe it, you can support it. If you don't believe it, you can wait for it to become more famous and try again, and continue to pay attention to its development
Qubu app is just a free mobile sports pedometer with blockchain technology. All users register and use it for free. It doesn't involve the entry fee, membership fee and membership fee of similar MLM. There is no three-level distribution system and five level three Jin system in the market promotion incentive system, so it's not even MLM
since September 1, 2018, qubu app has not absorbed a cent of registered users. In the process of operation, the company has not set up a fund pool or touched every cent of transactions between users. It has achieved a completely decentralized operation, so there is no such thing as a fund pool The 1 yuan paid for real name authentication is the verification fee of sesame credit face recognition system. Ant financial service has collected the money, but the company has not. You can search on the Internet: after the introction of sesame authentication procts is opened, you can check the fee of "face SDK authentication") The following is the latest news of interesting step
the chain reform is to use the blockchain technology and economic model to transform the traditional economic form of enterprises or institutions, optimize and upgrade the original business model, proct model, incentive system and user system by using the characteristics of the blockchain, such as decentralization, consensus mechanism, tamper proof, traceability and encryption algorithm
just open a shop in qubu mall.
Bus route: 872
takes 1 hour and 22 minutes
walk 834 meters
ticket price 4 yuan
33 stops in total
1. Walk 508 meters to Heidelberg bus stop at South America World Trade Center (bus stop)
2. Take bus no.872 (to the direction of the city bus terminus) and pass 33 stops to the bus stop of the city bus terminus
3. Walk 326 meters to Dongguan terminal< br />
before submitting to the administrative organ for approval, the real estate development company should handle the land transfer proceres, entrust the qualified survey and Design Institute to study and prepare the report on the project to be built, attach detailed planning and design parameters and effect drawings, and implement sufficient development funds< According to the current laws, regulations and rules of our country, the administrative licensing proceres of real estate construction projects are generally divided into six stages: 1) site selection and fixed-point; 2) administrative approval; 2) Review the general plan and determine the planning and design conditions; 3) Preliminary design and construction drawing review; 4) Review of planning construction drawings; 5) Construction report; 6) Comprehensive acceptance record of construction project completion
first, site selection and fixed-point stage. At this stage, the following matters are generally handled:
1. The Planning Commission reviews the feasibility study report and sets up the project
2. The Bureau of land and resources reviews the overall land use planning and land supply mode
3. The Construction Committee handles the opinions on the construction conditions of investment and development projects
4. The environmental protection bureau handles the environmental protection opinions of proction projects (table)
5. The Culture Bureau, earthquake bureau, landscape Bureau and Water Conservancy Bureau review the content and scope of construction engineering related specialties
6. The planning department handles the project site selection proposal< In this stage, the following general matters shall be handled:
1. The Civil Air Defense Office shall review the layout of civil air defense projects
2. The Bureau of land and resources concts land preliminary examination
3. Public security fire brigade, public security traffic police detachment, Ecation Bureau, Water Conservancy Bureau, Urban Management Bureau, environmental protection bureau, landscape Bureau and Culture Bureau shall review the contents and scope of construction engineering related majors
4. The planning department reviews the general plan and issues the construction land planning permit
5. The planning department determines the planning and design conditions of construction projects< In this stage, the following general matters shall be handled:
1. The planning department shall review the planning requirements of the preliminary design
2. The public security fire brigade shall review the fire protection design of the preliminary design
3. The traffic police detachment of the Public Security Bureau reviews the traffic conditions of the preliminary design
4. The Civil Air Defense Office reviews the preliminary civil air defense design
5. The Bureau of land and resources concts land use pre examination
6. Municipal departments, environmental protection bureau, Health Bureau, Seismological Bureau and other relevant departments review the relevant professional contents of the preliminary design
7. The Construction Committee issues the preliminary design approval, and reviews the implementation of the requirements of the preliminary design approval documents
8. The Construction Committee concts Policy Review on the construction drawing design documents, and issues a technical review entrustment notice according to the opinions of the owner
9. The Construction Committee issues the approval letter for the examination of construction drawing design documents according to the examination report of construction drawing design documents issued by the examination organization of construction drawing design documents< In this stage, the following general matters should be handled:
1. The fire brigade of public security carries out the fire design review
2. The Civil Air Defense Office reviews the civil air defense facilities
3. The Construction Committee, municipal departments, landscape Bureau, environmental protection bureau and Health Bureau shall review the contents and scope of relevant specialties according to their responsibilities
4. The planning department's supplementary approval rules for the planning and design of the changed part
(1) application form for fire control safety inspection< (2) a of the business license or a notice of pre-approval of the enterprise name issued by the administrative department for Instry and commerce
(3) copies of legal documents obtained in accordance with the law for fire control acceptance or completion acceptance of construction projects< (4) fire safety system, fire fighting and emergency evacuation plan, and site layout plan
(5) records of pre job fire safety ecation and training for employees and copies of professional qualification certificates for special types of work in fire instry obtained by operators of automatic fire control system< (6) other materials required by laws and administrative regulations
in accordance with the regulations on the supervision and administration of fire protection in construction projects, if the public gathering places which do not need to carry out the fire protection record of completion acceptance apply for the fire safety inspection, they should also submit the fire protection design and construction drawings of the interior decoration of the places, the quality certification documents of the fire protection procts, the certification documents of the fire protection performance of the decoration materials meeting the fire protection technical standards, and the factory certificate
the Fire Department of the public security organ should accept the application for fire safety inspection in accordance with the relevant provisions of the administrative license.