To Pujiang passenger transport center
Publish: 2021-05-22 12:37:00
1. Passenger transport center, you mean Binwang. Just walk a short distance to Yiwu Hotel, and you will pass by. Many people get on the bus there. Remember the intersection of Gongren North Road and Binwang road
2. Inter bank transfer not only through the bank's own system, but also through the system of the people's Bank of China, which involves the problem of small run batch. If it is a large amount of inter-bank transfer, it is generally real-time and fast; Small amount transfers need to be collected into a batch through the system. Only when a certain amount is reached can they be sent out uniformly. They are transferred to the receiving bank through the PBC system. If they just arrive at the last few transactions of this batch, they will arrive at the account quickly. If they just send out a batch, they will have to wait.
3. Article 18 mining, Quarrying and blasting operations are prohibited within 1000m from the toe of embankment slope on both sides of the railway line, the top of cutting slope and the outside of railway bridge, and within 1000m from both sides of the center line above the railway tunnel.
4. According to the regulations on railway safety management, the operation of quarrying, mining, water intake and empty mining within 25 meters from the railway must be approved by the Railway Bureau and the track maintenance and train management of the line under its jurisdiction.
5. According to the railway safety management regulations:
railway line safety protection zones should be set up on both sides of the railway line. The scope of the railway line safety protection zone, from the foot of the railway line embankment slope, the top of the cutting slope or the outside of the railway bridge (including railway and road bridge, the same below), is respectively:
(1) 10 meters for urban high-speed railway and 8 meters for other railways
(2) the high-speed railway in suburban residential areas is 12 meters, while other railways are 10 meters
(3) the high-speed railway in rural residential areas is 15 meters, and other railways are 12 meters
(4) in other areas, the high-speed railway is 20 meters and other railways are 15 meters
if the distance specified in the preceding paragraph can not meet the needs of railway transportation safety protection, the railway construction unit or railway transportation enterprise shall put forward a plan, and the railway supervision and administration institution or the local people's government at or above the county level shall delimit it in accordance with the proceres specified in the third paragraph of this article.
railway line safety protection zones should be set up on both sides of the railway line. The scope of the railway line safety protection zone, from the foot of the railway line embankment slope, the top of the cutting slope or the outside of the railway bridge (including railway and road bridge, the same below), is respectively:
(1) 10 meters for urban high-speed railway and 8 meters for other railways
(2) the high-speed railway in suburban residential areas is 12 meters, while other railways are 10 meters
(3) the high-speed railway in rural residential areas is 15 meters, and other railways are 12 meters
(4) in other areas, the high-speed railway is 20 meters and other railways are 15 meters
if the distance specified in the preceding paragraph can not meet the needs of railway transportation safety protection, the railway construction unit or railway transportation enterprise shall put forward a plan, and the railway supervision and administration institution or the local people's government at or above the county level shall delimit it in accordance with the proceres specified in the third paragraph of this article.
6. The pulling force on the rope on both sides of the fixed pulley:
if the object at both ends of the rope is moving, it is calculated according to the acceleration of the object and the gravity of the object (using Newton's law)
if the two ends of the rope are stationary, it is calculated according to the force balance of the object
that is to say, do not analyze the force on the rope. The light rope has no mass, and the force on both ends must be the same
the tension of the hanging rope in the middle of the fixed pulley:
equal to the vertical component of the gravity of the pulley plus the tension of the ropes on both sides
then the pull of the rope on the object is equal to the pull of the object on the rope ~ ~ according to the three laws of Newton
if the object at both ends of the rope is moving, it is calculated according to the acceleration of the object and the gravity of the object (using Newton's law)
if the two ends of the rope are stationary, it is calculated according to the force balance of the object
that is to say, do not analyze the force on the rope. The light rope has no mass, and the force on both ends must be the same
the tension of the hanging rope in the middle of the fixed pulley:
equal to the vertical component of the gravity of the pulley plus the tension of the ropes on both sides
then the pull of the rope on the object is equal to the pull of the object on the rope ~ ~ according to the three laws of Newton
Hot content