blockchain includes public blockchain, joint (instry) blockchain and private blockchain. Public chain point-to-point e-cash system: bitcoin, smart contract and decentralized application platform: Ethereum

blockchain is a new application mode of distributed data storage, point-to-point transmission, consensus mechanism, encryption algorithm and other computer technologies

blockchain is an important concept of bitcoin. In essence, it is a decentralized database. At the same time, as the underlying technology of bitcoin, it is a series of data blocks generated by using cryptographic methods. Each data block contains a batch of bitcoin network transaction information, Used to verify the validity of its information (anti-counterfeiting) and generate the next block



extended data

according to the different degree of blockchain network centralization, three kinds of blockchains under different application scenarios are differentiated:

1. The blockchain with the whole network open and without user authorization mechanism is called public chain

2. The authorized nodes are allowed to join the network, and the information can be viewed according to the authority. It is often used in the inter agency blockchain, which is called alliance chain or instry chain

3. All the nodes in the network are in the hands of one organization, which is called private chain

alliance chain and private chain are also called licensing chain, and public chain is called non licensing chain

blockchain features

1, decentralization. Blockchain technology does not rely on additional third-party management institutions or hardware facilities, and there is no central control. In addition to the self-contained blockchain itself, each node realizes information self verification, transmission and management through distributed accounting and storage. Decentralization is the most prominent and essential feature of blockchain

2. Openness. Blockchain technology is based on open source. In addition to the private information of all parties involved in the transaction is encrypted, the data of blockchain is open to everyone. Anyone can query blockchain data and develop related applications through the open interface, so the information of the whole system is highly transparent

3. Independence. Based on consensus specifications and Protocols (similar to various mathematical algorithms such as hash algorithm used by bitcoin), the whole blockchain system does not rely on other third parties, and all nodes can automatically and safely verify and exchange data in the system without any human intervention

4. Safety. As long as 51% of all data nodes cannot be controlled, the network data cannot be arbitrarily manipulated and modified, which makes the blockchain itself relatively safe and avoids subjective and artificial data changes

5. Anonymity. Unless there are legal requirements, technically speaking, the identity information of each block node does not need to be disclosed or verified, and the information can be transferred anonymously

2. Since its establishment, Beijing Digital Capital Technology Co., Ltd. has been committed to studying how to effectively solve the instry pain point of "traditional instry + blockchain". Various projects emerge in endlessly in the blockchain instry, and the technology has been innovated repeatedly. At present, the hottest topic is "stable currency". Beijing digital technology has also been supporting the stable currency system, bringing new development opportunities for the blockchain instry
what is stable currency
stable currency, as its name suggests, is a cryptocurrency with stable value, and its exchange ratio with legal currency remains relatively stable. Because the exchange ratio between legal currency and goods and services is relatively stable, the ultimate anchor of stable currency is goods and services, that is, the actual purchasing power
stable currency originated from usdt (benchmarked US dollar) issued by 2014 bitfinex established tether limited. The opportunity for the birth of cryptocurrency is that the mainstream currency accounts for the vast majority of the market value, but the price fluctuates violently, which makes the liquidity of cryptocurrency market decline. In this case, in order to protect their assets, investors need to find a better way to store value, so the stable currency market arises at the historic moment
the essence of stable currency is a kind of accounting voucher
modern banking system is based on the central bank at the bottom, commercial banks at the top and financial technology companies at the top. Their basic prototype mainly comes from the double entry bookkeeping which was born 500 years ago. Even after so many years, the banking system is constantly developing and changing, but its core is the centralized account system, which depends on the central bank. When we transfer money from one account to another, we are actually making account changes through the bank. When using stable currency for transfer and remittance, it completely transfers from its own account book to another account book. The essence of stable currency is a kind of bookkeeping voucher
some people would say, isn't Alipay also using block chaining technology? On this basis, Alipay upgraded and upgraded the account book, which is two different schemes based on the stable currency issued by block chain technology. You see that money is transferred from a Alipay account to another Alipay account, but it is still operated in the central bank's account system.
why is stable currency the future of blockchain
at present, stable currency is mainly used to provide channels for legal currency to enter the cryptocurrency world, help currency people avoid risks in transactions, and provide payment services for blockchain application projects. Although the current digital currency market is not too optimistic, but the cryptocurrency project is in constant development. The number of stable currencies on the market has already exceeded 50, and is still on the rise. 2019 is bound to be the year of stable currency outbreak. How did stable currency break through in the wave of digital currency? Why is stable currency the future of blockchain? This involves how stable currency affects the blockchain instry
tickets for users to enter the market
after "94" in 2017, China banned the market circulation of cryptocurrency, restricted banks and other financial institutions as payment platforms or channels, and many countries also restricted the circulation of cryptocurrency. But there are still a lot of users who want to enter the market, they will choose over-the-counter trading and trade through the community. But because of the uncertainty, opacity, small scale and other problems, OTC has some trading risks. Usdt, a stable currency anchored to the US dollar at a ratio of 1:1, has become a supplementary scheme for some new funds
the insurance medium of user assets
in the weak market, the price of token fluctuates greatly, and traders do not want to take risks or leave the market. In the case that the trading platform does not support legal currency trading pairs, it is almost the only choice to use "stable currency trading pairs" to exchange for stable currency
the emergence of stable currency is the proct of a special historical stage e to the contradiction between the rapidly developing demand for token investment and the restriction of legal currency admission by regulation. The more serious the price fluctuation of mainstream currency is, the more valuable the existence of stable currency is
"trade as settlement" is an efficient payment and settlement tool
blockchain technology has great value in the field of payment and settlement. With the emergence of JPMorgan JMP, many banks around the world have begun to explore how to use blockchain technology to issue stable currency. The "stable currency" issued by these banking giants is essentially using a convenient and efficient settlement network based on blockchain technology. The more financial institutions and customer groups join the network, the greater the value of the settlement network
as JPMorgan Chase, IBM and Facebook have revealed that they want to issue currency, stable currency has once again set off an upsurge. After the strong fluctuation of usdt in the second half of 2018, it was derided as "unstable stable currency" by many people, so Pax, tusd, GUSD, etc. followed closely. Seizing the market quota of stable currency is very fierce for a time, but the fierce market competition means that there is not much space left in the market, and no matter how much stable currency there is, it seems meaningless. Then the major exchanges began to launch their own platform currency. JPMorgan Chase, IBM and Facebook also entered the market. The situation of stable currency also changed greatly. Facebook and JPMorgan have both broad user base and far-reaching economic impact, and issuing currency will certainly have inherent advantages. Beijing Digital capital technology, which is deeply engaged in the study of the significance of stable currency, has made practical application of stable currency in postal, supply chain finance, lottery and other fields. It is understood that the world's first African blockchain lottery will also be released in the near future. In this way, we can certainly expect to stabilize the currency market.
3. Truechain is the world's first mixed consensus public chain. I know it was launched on February 9, 2018
4.
  1. dig down alternately, don't dig under your own feet

  2. when digging a cave, surround your own vertical mine in the cave. Interested players can explore in the cave, please refer to the following cave mining method

  3. when the lava is excavated, it is buried with sand

  4. when you see the pebble you didn't put, dig it up and dig out the monster cage inside; When you see the stone bricks, please thicken the wall of the mine to avoid being blown up by Guli

  5. after the bedrock is excavated, four squares up are the most suitable for digging diamonds, and two squares up are suitable for digging iron

  6. dig a large space as a transfer station after reaching the desired number of floors, and then excavate a mine road with one grid wide and three or four grids high around. Please design the distribution of the mine road yourself

  7. after the ore is excavated, it should be put into the box of the transfer station as soon as possible and brought back to the ground

  8. when you dig a cave, please plug it. When there is magma flowing out, quickly retreat, and then plug it with something that can't be burned. Be careful to burn your hands

  9. the first step is to build pickaxes after mining

5.

When the filling mining method is used to mine the ore body, the mining area is also divided into two steps: room mining and pillar mining. It is characterized by the use of filling materials to fill the space after mining with the progress of mining. There are two functions of filling materials: one is to maintain the upper and lower wall rock of the mine house; The second is to form a worktable, where the staff stand on the filling material for drilling, blasting and ore drawing. This mining method is mainly used for: (1) the ore is stable but the surrounding rock is not stable enough

(2) the surface is not allowed to collapse

(3) the mining of rare and precious metals or high-grade rich ore requires small loss rate and dilution rate

(4) the deposit has the risk of spontaneous combustion

The dip angle of ore body is generally 50 °~ sixty ° Above

(1) water sand filling mining method:

1. Overview

e to the continuous development of proction, the allowable filling mining method has also been improved. In recent years, the use of water sand filling mining method in underground metal mines is graally increasing. The essence of water sand allowable filling method is to transport the allowable filling materials to the working face for filling along the pipeline system with the help of water

2. Typical scheme

Fig. 5-5-16 is a typical scheme of upward horizontal slicing and wall protection slag hydraulic filling mining method in Tonglushan Copper Mine. The deposit of the mine is a copper mine with steep dip and extremely thick ore body, with high grade. The ore is copper bearing magnetite, hard and stable. The surrounding rocks are skarn, marble and granodiorite, which are moderately stable. There are lakes on the surface of the earth, so it is not allowed to collapse. According to the above characteristics, the water sand filling mining method is adopted

The

mining area division and constituent elements are several mining areas in each stage. When the thickness of the ore body is more than 10-12m, the mining area is arranged perpendicular to the strike of the ore body; When the thickness of ore body is less than 10-12m, the mining area is arranged along the strike. Each mining area is divided into room and pillar. When the mining area is arranged vertically, the width of the room is 7m and the width of the pillar is 9m. The thickness of roof pillar is 4-6m, the height of bottom pillar is 5-7m and the height of stage is 60m

Mining preparation includes driving through vein roadway, stope filling well, drawing gate chamber, bottom pulling roadway, drawing pass below the bottom pulling level and filtering air inlet pedestrian shaft, etc

the vein crossing roadway is driven on the boundary line between the room and pillar to meet the needs of both room and pillar mining. The vein crossing roadway is mainly used for ore transportation and prospecting. Its section is 2.4m × 75m with monorail

according to the design requirements, a filling raise is set every 30-40m along the length of the mine room. In principle, the filling well should be located in the center of the stope to fill the whole stope equidistant. There are two kinds of filling well specifications: when the bucket method is used for construction, the cross section is 1.8m × 2m When the common method is used, the cross section is 1.8m × 1.5m The filling well is divided into two compartments, namely, between ladders and between filling pipes. The filling well is mainly used to lower the filling material and return air

the pedestrian filter well is mainly used for pedestrians, water filtration, air intake and lifting materials and equipment. According to the requirements of safety proction, a stope should be equipped with at least two filter wells. When the stope is long, more than two should be set up. The cross section of the filter well is 1.8m × 1.8m, which should be divided into two compartments: one is the ladder room and the other is the lifting material room

The

chute is mainly used as caving mine, and its section size is 1.5m × 1.5m and 1.8m × 1.5m. Its section size should be more than 3 times of the maximum allowable block size. A fan-shaped pneumatic gate with single or double cylinders is installed at the lower part of the chute

the pedestrian filter well and chute should be arranged at intervals in the stope, which is convenient for pedestrian, water filtering and ore drawing

the cutting work is to excavate the bottom pulling roadway (cutting roadway) along the long axis of the mine room above the floor pillar, connect each filter well and chute, and then take the roadway as the free surface to expand the side, pull all the bottom of the mine room to form a bottom pulling space of 2.0m high, and then carry out the roof lifting of 2.5-3.0m. After all the ore is transported out, the reinforced concrete bottom plate shall be built with the thickness of 0.8 ~ 1.0m, and the concrete grade shall be 100 ~ 150

4. Mining work

the mining method of upward horizontal slicing is adopted in the mine, and the slicing height is 2.0m. When the ore is stable, the mining height can be increased to 4-5m, that is, the filling can be carried out after two layers of continuous mining. This can rece the auxiliary operation time and improve labor proctivity

the rock drill was used to drill the upward blast hole to collapse the ore, and the hole depth was 1.6m. After ore caving, horizontal blasthole is drilled by rock drill to press the top. The height is 1m, which not only increases the height of ore caving, but also ensures the specification and stability of stope

Each stope is equipped with a pneumatic loader for ore drawing. This kind of loader has the advantages of flexible loading, fast speed, high efficiency and strong capacity in filling stope. Especially, the ore is loaded cleanly and saves a lot of labor, which is very popular among workers. At present, the average working efficiency of zyq-14 and zyq-12 can reach 80-90t and 60t respectively. In order to further improve the ore drawing efficiency of the loader, we should try our best to rece the output rate of large blocks, strengthen the quality management of the floor pavement, and do a good job in the repair and maintenance of the loader. When the stope is finished, the loader is hung on the stope roof or transferred to the adjacent stope for filling operation

The fresh air flows into the stope from the filter well, and the gun smoke and dirty air are discharged to the upper return air roadway through the filling raise and pumped to the surface through the air shaft. This kind of mining preparation layout has better ventilation conditions

After all the ore is discharged, the stope will form a space of 4-4.5m, and the filling will begin. The filling work includes masonry wall protection, pouring pedestrian filter well and chute, water sand filling, pouring concrete floor and partition wall, etc

(1) masonry precast block: in order to ensure the smooth mining of pillars, concrete partition wall (also known as wall protection) should be poured before stope filling. In the past, wood formwork was set up when pouring concrete, but now it is replaced by masonry concrete precast block to save a lot of wood

the specification of precast concrete block is 300m × 200m × 500mm, each piece weighs 21kg. The thickness of partition wall shall not be less than 0.6m. In order to prevent the built precast concrete block wall from being overpowered by the filling material, the precast concrete block cross brace is built every 5-7m between the precast concrete block wall and the mine wall for reinforcement

(2) heightening along road patio: at the same time of concrete brick wall construction, heightening along road pedestrian shaft and chute. The heightening height is 2.0 m. A 3 cm thick wooden formwork is erected in the shaft along the road, and concrete precast blocks are built outside. A gap of 0.2-0.3m shall be left between the wood formwork and the precast concrete block to facilitate concrete pouring. 0.2m for filter well and 0.3m for chute. When the filter well is built with prefabricated blocks, 1-2 filter holes shall be reserved on each side. When the water sand is allowed to be filled, these holes shall be blocked with 1-2 layers of straw bags, and the water shall be filtered after filling. After the water is filtered out, the gap between the Bush formwork and the concrete block is poured with concrete. This kind of water filtering measure is simple and reliable, but it is only suitable for filling materials with good water filtering performance, such as furnace slag. Tonglushan mine is filled with furnace slag

(3) furnace slag filling: all preparations must be made before water sand filling, including installation of filling signal, connecting pipe, water discharge test tube, etc. The stope filling pipe is 4-inch ordinary steel pipe. The forward filling method is adopted, that is, from the filling yard to both ends of the mine room. In this way, the accumulated slag pile can be used as a support for erecting filling pipes in the stope, and the pipes can be connected forward while filling sand, which is also convenient for the operators. The filling height of slag is 1.8-1.9m. The sand filling capacity is 40-45m < sup > 3 < / sup > per hour. The sand filling concentration is about 40%. After the completion of slag filling, the surface of slag in the stope is always uneven. Therefore, manual leveling is needed, and the labor intensity is high. Therefore, mechanization of leveling should be realized. This is an important research topic

(4) concrete pouring: set up a concrete mixing station on the surface, transport the concrete to the underground after preparation, and then put it down to the stope by pipeline through stope filling well, and transport it to the pouring place by tramcar. In the concrete partition wall, the thickness of pouring concrete is 0.4m

the function of the concrete floor is to separate the caving ore from the filling material, which is also a necessary measure to rece the ore loss and dilution in the room mining. At the same time, it also creates good ore drawing conditions for the loader, which is concive to improving the ore drawing efficiency of the loader. The thickness of the concrete floor is 0.15 ~ 0.2m, which can be ensured not to be damaged ring ore collapse

the pouring concrete partition wall, bottom plate and along road shaft should be constructed at the same time. After the completion of concrete construction, it also needs a certain curing period, and the operation can be started only after reaching a certain strength

Evaluation of water sand filling mining method the filling material is transported by hydraulic pipeline, which simplifies the process and equipment, improves the filling capacity and reces the filling cost. The filling body of water sand filling is dense with high compressive strength, which can effectively control the mine pressure and prevent the movement of surrounding rock. If tailings from concentrator is used as filling material, it is not only cheap and has a wide range of material sources, but also can rece the facilities for tailings accumulation and rece the floor area. Therefore, as long as conditions permit, tailings should be used as filling material as far as possible. From the development trend of this mining method in China's metal mines, tailing filling is more widely used

The water sand filling mining method also has many disadvantages, for example, the preparation of filling materials and filling facilities are relatively complex, and the filling water, underground dewatering and drainage facilities are increased. In addition, it is very hard to clean the tunnel and the water tank. In the future, we should further simplify the preparation process of filling materials, improve the mechanization level of rock drilling and transportation, improve the management of desliming, dehydration and drainage, and seek an effective top connection process

According to the mine practice of using water sand filling method in our country, it is considered that the complex mining process is mainly caused by masonry partition wall, which has high labor intensity and low efficiency. If the cemented filling method is used to mine the pillars, the artificial mixed soil pillars will be formed to replace the masonry partition wall and resial pillars, and then the water sand will be used to fill the pillars back to the mining room, which will simplify the process and improve the proction efficiency

Fig. 5-5-17 schematic diagram of dry filling mining method (a-projection, b-stereogram)

Fig. 5-5-18 schematic diagram of box support filling mining method

Fig. 5-5-17, FIG. 5-5-18 and Fig. 5-5-19 are schematic diagrams of dry filling mining method, box support filling mining method and cemented filling mining method respectively

Fig. 5-5-19 schematic diagram of cemented filling mining method

6. You can search the official website of Baizhan programmers and share free information, which is great
7. Use some cheaper materials, such as clay and pebbles. And then mining.
8.

We need it

1. Regular licenses of food and beverage manufacturers: business license, tax registration certificate, proction license, health license and other local regulations

2. Mineral water proction license: mineral water registration certificate, mineral water intake certificate

Equipment license: air compressor, bottle blowing machine, forklift and personnel operation license

First of all, the mineral substance content of the source water should meet the national standard for mineral water, without any pathogenic bacteria, the surrounding environment of the water source should meet the national requirements, and the detection in dry season and four seasons should meet the national standard for mineral water. The certificate can only be issued after the application of the manufacturer and the follow-up detection and evaluation of relevant departments

5. The marketing of packaging drinking water enterprises is the most important factor to decide the success or failure. Please learn more and build a marketing team with strong learning and practical ability

< H2 > extended information

if the successful bidder or the winner provides false documents to conceal facts, colludes maliciously, bribes the competent department or the evaluation committee and its members, or wins the bid or wins the bid by other illegal means, the result of winning the bid or winning the bid is invalid, and the bid or bidding security paid will not be returned

the competent authorities shall register the winning bidder and the winning bidder, obtain mining license and protect the legitimate rights and interests of the winning bidder and the winning bidder according to law

if the competent authorities sign the transaction confirmation, win the result of competition or fail to handle the mining license according to law, the superior competent authorities shall order them to make corrections within a time limit, and the directly responsible persons in charge and other directly responsible persons shall be given administrative sanctions according to law; If losses are caused to the winning bidder or the winning bidder, the winning bidder may apply for administrative compensation according to law

9.

Many players in my world dig water when they are mining. They are all confused. They don't know what to do. In fact, it's very easy. So, what should I do when I dig water in my world? Now by the iron net for you to bring my world mining water solution

My world's solution to water mining In my world, if you encounter abandoned mines, or when you are mining, you often find magma or water. If you dig to the seaside, it's easy for the seawater to pour in. Where the seawater comes in, you will be washed away

In this case, friends can block up the water with stones. If it's mining, there will be a lot of stones in the backpack. As long as the stone is blocked against the place where the water comes in, the water that has been poured in will be blocked. If the water is on the plane, it will flow back

But if there is a pit, then the water will stay in the pit. The water left in the pit can be collected in buckets. But the bucket can only collect static water, so there is no way to meet the flowing water. Take an empty bucket and face the place where you just poured water, which is the source of water. Click to collect water

If it's water that can't be collected, there are two ways. One is to use magma. If the magma is put into the water, the water will turn into a pebble and it can be g out. Another is sponge, which can suck up water

10.

true

true

is true

real

Real

as a player he was unselfish, atruetaman

as a player, he has no selfishness and really puts himself in the team


it's my pleasure to answer for you at the first time. I wish you progress in your study

if you have any questions, please ask in time, thank you ~ ~ o (∩)_ ∩)O

Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750