2. HS design elevation; HW excavation; At fill area; Aw excavation area
design elevation: the elevation required after the completion of the project, which refers to the elevation of the road surface extending to the center line of the road surface at the time of final forming
excavation: refers to the volume of earth and rock excavated from the original ground to the subgrade surface when the subgrade surface is lower than the original ground
fill: refers to the volume of earth and rock from the original ground to the subgrade surface when the subgrade surface is higher than the original ground. Earthwork filled to foundation or other places ring civil engineering construction
excavation: refers to the volume of earth and rock excavated from the original ground to the subgrade surface when the subgrade surface is lower than the original ground
construction drawing: it refers to the general layout of the project, the external shape, internal layout, structural structure, internal and external decoration, material method, equipment and construction requirements of buildings and structures.
design elevation: the elevation required after the completion of the project, which refers to the elevation of the road surface extending to the center line of the road surface at the time of final forming
excavation: refers to the volume of earth and rock excavated from the original ground to the subgrade surface when the subgrade surface is lower than the original ground
fill: refers to the volume of earth and rock from the original ground to the subgrade surface when the subgrade surface is higher than the original ground. Earthwork filled to foundation or other places ring civil engineering construction
excavation: refers to the volume of earth and rock excavated from the original ground to the subgrade surface when the subgrade surface is lower than the original ground
construction drawing: it refers to the general layout of the project, the external shape, internal layout, structural structure, internal and external decoration, material method, equipment and construction requirements of buildings and structures.
3.
CDN can only mitigate DDoS attacks. In general, CDN will assign you some IP addresses in various provinces and cities, and then resolve the nearest IP address in each province and city through Intelligent DNS
4. The upper full-length reinforcement is not allowed to be disconnected at the support position in the column, and the design is that the upper reinforcement on both sides of the support is the same
bending anchor is needed at the support position beside the frame (usually the length of straight anchor can't meet the requirements), and there are relevant node drawings, please refer to 101 standard atlas for details.
bending anchor is needed at the support position beside the frame (usually the length of straight anchor can't meet the requirements), and there are relevant node drawings, please refer to 101 standard atlas for details.
5. The code of core area of flat beam joint of floor frame is KBH
such as kbh1 Φ 10,FX&Y 2*7 Φ 14 (4), which means the core area of the middle support node of the frame flat beam: the vertical tie bar in the core area outside the column Φ 10, two layers of 7 are arranged along the X direction (Y direction) of the beam Φ 14 additional longitudinal reinforcement, each layer has 4 (a total of 8) longitudinal reinforcement outside the column, 2 on both sides of the column. KBH1 Φ 10,FX2*7 Φ 14 (4), indicating the support at the flat beam end of the frame, and the rest are the same.
such as kbh1 Φ 10,FX&Y 2*7 Φ 14 (4), which means the core area of the middle support node of the frame flat beam: the vertical tie bar in the core area outside the column Φ 10, two layers of 7 are arranged along the X direction (Y direction) of the beam Φ 14 additional longitudinal reinforcement, each layer has 4 (a total of 8) longitudinal reinforcement outside the column, 2 on both sides of the column. KBH1 Φ 10,FX2*7 Φ 14 (4), indicating the support at the flat beam end of the frame, and the rest are the same.