當前位置:首頁 » 挖礦知識 » 挖礦翻譯

挖礦翻譯

發布時間: 2021-03-29 04:45:50

Ⅰ 采礦專業英文翻譯

The Ge Ting coal mine is that Zi Bo City Bureau of Mines develops the third pair of the northwest part modernizing a shaft , being located in Shandong Province Ji Ning City building in helping north mining area. The shaft year designs 600,000 tons of efficiency , design the length of service 51. The shaft may cut coal being 3 coal , 16 coal , 17 coal tier mainly , the host mines 3 coal seams. The village , highway pressure coal are grave and , 3 coal seam length of service shortens since shaft geology condition is complicated,be prolong the shaft length of service, decide to exploit 16 , 17 coal, coal matches spirit with 3. And design that condition considers the queen synthetically , put forward opens up a scheme by the geology general situation , well-field range , reserves and 16 , 17 coal seam geology to well-field originally , push and big alleys by the fact that the economy technology ascertains the tie making use of 130 orbits to go up the hill preparing adhesive tape going up the hill comparatively going up the hill exploiting, the mining area being in progress to 1160 mining area designs that. By the analysis to 1160 mining area geology condition, the for sure adopt long unitary make for wall coal mining law , single wing exploits, coal mining handicraft has adopt top grade Pucai , has adopt all caving law to manage a roof, driving face adopt a cannon dig. And carry out equipment choosing a type , arrange turn out system after ascertaining the mining area parameter, work out safe technology measure. Keywords: Well-field opens up , mining area , make for increase wall coal mining law , top grade Pucai

Ⅱ 急求采礦專業英語翻譯

6.1
Rock
Mass
Classification
6.1岩石分級
1.Introction介紹
During
the
feasibility
and
preliminary
design
stages
of
a
project,
when
very
little
detailed
information
is
available
on
the
rock
mass
and
its
stress
and
hydrologic
characteristics
,the
use
of
a
rock
mass
classification
scheme
can
be
of
considerable
benefit.
在一個項目的可行性和初級設計階段,當獲得有關岩體和水文特性的資料非常少的時候,那麼一本岩石分級方案是相當大的益處.

Ⅲ 采礦專業翻譯

中等深度鑽孔空場采礦法
短孔留礦回採法

open stoping
空場采礦法
shrinkage stoping
仰采留礦回採法

shrinkage stoping
留礦回採

shrinkage stoping
留礦回採

shrinkage stoping
倉儲採煤法
急斜煤層中將采落的煤暫留於已采空間中,待倉房內的煤體采完後,再依次放出存煤的採煤方法。

shrinkage stoping
留礦采礦法

shrinkage stoping
留礦采礦法

Ⅳ 采礦用英語怎麼說

您好!
很高興為你翻譯、解釋。您提出的采礦用英語怎麼說?

只有專業說法:mining(漢字注音:埋嶺)最准確。(漢語含義:n.采礦, 礦業)可做動名詞。
英語的其他表達方式均不能准確地表達「采礦」的動名詞。

例如:mine pron.我的;n.礦, 礦山, 礦井, 源泉, 寶庫, 地雷, 水雷;vt.挖掘, 開采, 在...布雷, 破壞
vi.開礦, 埋設地雷等,只適合做「開礦」的動詞

希望我的翻譯、解釋對你有幫助,祝你心想事成!

Ⅳ 用采礦專業英語翻譯

煤炭是我國國民經濟的基礎產業,然而,我國的煤炭資源在開發利用過程中卻存在著不少問題
Coal is basic instry of our national economy, however, there are many problems in the process of exploitation and utilization.

為了能源的可持續供給,只有中國煤炭工業可持續發展,才能滿足煤炭的可持續供給, 這是中國的現實和未來
In order to supply energy continuously, The only way is sustainable development of China coal instry to satisfy sustainable supply, which is reality and future of China.

調整產業結構,加快產業轉型,內增企業活力,外增吸納生產要素的活力,加快走新型化工業道路,走多元化道路,培育發展多個支柱產業,才能使煤炭企業走上全面、協調、可持續發展的道路
To adjust the instrial structure, and speed up the instry transition, increase the enterprise's vitality inside and absorb vitality of proction factor from the abroad, accelerate going new type of instrial road and diverse road, and cultivate some pillar instries, so It is possible to go the road that is comprehensive, balanced and sustainable development for the coal enterprises.

若有所幫助,請採納,若需完善,請hi我.

Ⅵ 采礦英語翻譯

This design altogether nine chapters, respectively are the general remarks, the technical economy, the mining geology, mining, the mining slope ramp design, the mine ventilation design, the mining machinery, the assembly drawing transportation, safe specially. And mining, the mining machinery, the mining slope ramp project are the design main bodies, in mining used advanced low poor has damaged the non-lower column partition to come down the law, will have the huge economic efficiency, the special mining slope ramp project, mainly included the slope ramp position the determination, the slope ramp form choice, the slope ramp cross section specification, the slope ramp slope, slope ramp aspect and so on curve design, slope ramp construction contents. Some parts of designs contain the essential blueprint, the blueprint must defer to the concerned requirements plan.

Ⅶ 救命啊。英語翻譯,關於采礦的

下載一個,有道翻譯官軟體,或者網路拍照翻譯

Ⅷ 采礦專業英語翻譯

Abstract: Sham Tseng goaf water may accumulate and be difficult to detect in time is the exploitation of the process led to the flooding problems. In this paper, micro-rock mining in the breakdown of elastic waves generated by the information source, application of rock mass elastic wave and the related breakdown of the theory and technology, to explore unknown goaf water accumulation and nucleation process, found the exact elastic wave velocity than the VP / VS, the amplitude ratio VSH / VPH, spectral, waveform, and frequency of abnormal microseism. Application of this proposed microseism ground telemetry, on-line monitoring and prediction of mine water hazards unknown technical ideas.

Keywords: coal; process water; microseism technology; forecast warning

Ⅸ 采礦翻譯

我問的我英語專八在英文報社工作的同學,他說第一句是在一座山脈中,第二句是這座山脈被分成了幾個區域,sequence是連續的意思,你要是給點上下文可以更清楚

Ⅹ 采礦專業 英語翻譯

本設計是達茂鐵礦露天開採的工藝與開拓設計,年產量200萬噸。This opencut exploitation and pioneer design is applied to Damao Iron Mine, with an annual output of approximately 2 million tons.
採用境界剝采比不大於經濟合理剝采比的原則圈定露天開采境界。Open-pit boundary is contoured with the application of the rule of boundary stripping ratio less than or equal to economic stripping.
並進行可采儲量及平均剝采比的計算。And make a caculation of proved reserves and average stripping ratio.

用礦山延伸速度驗證生產能力。Throughput is verified by extension rate of the mine.

編制露天礦採掘進度計劃時,平均剝采比乘系數的方法初定生產剝采比,電鏟的效率根據類似礦山選取。 When working out the open-pit excavation schele, proction stripping ratio is initially decided by the approach of average stripping ratio mutiplied by coefficient while efficiency of electric shovel selected on the basis of similar mines.
本礦採用斜坡汽車螺旋坑線開拓。 The mine is exploited by vehicles along the slope of the spiral pit-line.
工藝部分包括穿孔設備選型及其數量的計算、電鏟設備的選型及其數量的計算、汽車數量的計算及選型、推土機選型及數量計算、輔助設備的選型及數量的計算等。Techniques include the selection and caculation of drilling equipments,electric shovels,vehicles,bulldozer as well as assistant auxiliary equipments.
爆破方法是選擇及葯量計算,運輸調車方式是選擇,排土方法的選擇及排土計算。 Blasting method is the selection of dosage and caculation;shunting method is the selection as well as the selection of mping and and mping caculation.
關鍵詞:露天開采 開拓 工藝 採掘進度計劃
Key words: open-pit exploitation;excavation;techniques;excavation schele

同學,累死我了;一個多小時翻譯的你的這篇文章,^_^。

熱點內容
區塊鏈交易id到賬 發布:2025-01-10 14:56:39 瀏覽:325
trx幣技術分析 發布:2025-01-10 14:40:35 瀏覽:65
p45挖礦bios 發布:2025-01-10 14:25:05 瀏覽:227
基於區塊鏈技術的電子證照 發布:2025-01-10 14:15:45 瀏覽:190
區塊鏈經濟學選擇題 發布:2025-01-10 14:10:14 瀏覽:536
比特幣BTC實時行情 發布:2025-01-10 14:10:12 瀏覽:554
doge是嘲諷的意思嗎 發布:2025-01-10 13:59:57 瀏覽:399
以太坊還會漲嗎2021年 發布:2025-01-10 13:59:12 瀏覽:423
現在區塊鏈有多少公司 發布:2025-01-10 13:59:07 瀏覽:866
摩根大通數字貨幣 發布:2025-01-10 13:53:48 瀏覽:118